Which of the following documents would typically not be produced
during the schematic design phase of the Project's design stage?
A. Sketches
B. Outline specifications
C. Models
D. Preliminary project descriptions - Correct Answer - B. Outline
specifications
Allowances, alternates, and unit prices are used to control all of the
following except:
A. Indeterminate items
B. Postponement of decisions
C. Contractor selection
D. Construction costs - Correct Answer - C. Contractor selection
In a specification section, all of the following are Articles in "Part 1 -
General" except:
A. References
B. Submittals
pg. 1
,2|Page
C. Source Quality Control
D. Administrative Requirements
E. Field Conditions
F. Warranties - Correct Answer - C. Source Quality Control
Which of the following is not an alternative term for project conception?
A. Programming
B. Pre-design
C. Design development
D. Needs assessment - Correct Answer - C. Design development
Which of the following is an untrue statement about project
programming?
A. Project goals and problem statements are established
B. Four concepts include: form, function, time, economy
C. Construction drawings are completed
D. Five steps include: establish goals, collect and analyze facts,
understand and test concepts, determine needs, state the problem -
Correct Answer - C. Construction drawings are completed
The Procurement Documents include all of the following except:
A. Procurement Requirements
B. Contract modifications
C. Project manual
pg. 2
,3|Page
D. Drawings - Correct Answer - B. Contract modifications
Which of the following is not part of the Contract Documents?
A. Agreement
B. Procurement forms
C. Contract modifications
D. Performance Bond
E. Addenda - Correct Answer - B. Procurement forms
A facility's life cycle includes all of the following except:
A. Project Conception
B. Financing
C. Construction
D. Facility Management - Correct Answer - B. Financing
A construction manager is hired by the Owner to do all of the following
except:
A. Assist in procuring the contractor
B. Administer the project
C. Provide observation services at the construction site
D. Supervise the A/E - Correct Answer - D. Supervise the A/E
Which of the following is in the proper order, relative to the construction
stage?
pg. 3
, 4|Page
A. Claim, mediation, binding arbitration
B. Change order, litigation, mediation, arbitration
C. Dispute, change order, termination
D. Termination, binding arbitration, dispute review board, change order -
Correct Answer - A. Claim, mediation, binding arbitration
What activities help the Owner define specific needs and identify
existing conditions and future trends?
A. Prequalification of bidders
B. Feasibility studies
C. Contract negotiations
D. Competitive bidding - Correct Answer - B. Feasibility studies
The Agreement defines the relationships and basic obligations between
the:
A. Owner and Contractor
B. Owner, A/E, Contractor, and surety
C. A/E and Contractor
D. Owner, Contractor, subcontractor, and material Suppliers - Correct
Answer - A. Owner and Contractor
Which of the following is not one of the types of commissioning
recognized by CSI?
A. Commissioning a naval vessel
B. Equipment and system commissioning
pg. 4