questions with verified answers
Asphalt Detachment Ans✓✓✓ (NG and USAR)
Asphalt plant ops and paving for major horizontal construction
Up to 2250 tons of asphalt per shift per day
3-4 miles per shift per day
Rock provided by quary platoon
Bridge Site Reconnaissance Ans✓✓✓ - Access and approach roads
- Widths
- Banks
- Flow characteristics
- Stream Bottoms
- Elevations
- Materials
- (on existing) determine if situation warrants emplacing tactical,
support, or LOC bridge
CEC-A Specifics Ans✓✓✓ 6x MICLIC
2x ABV
2x Blade team
, CEC-I Specifics Ans✓✓✓ 2x MICLIC
1x Blade team
2x cranes
Classifications of Airfields Ans✓✓✓ Light (F15, C-17)
Medium (F-15, C-17. B-52)
Heavy (F-15, C-5, B-52)
Modified Heavy (F15, C-17, B-1)
Auxiliary (F-15)
Assault Landing Zone (C-130, C-17)
Clearance Company Ans✓✓✓ detection and IED nautralization
- 3 combat engineer platoon (2 clearance squads)
- 1 equipment platoon (removal of rubble, debris, etc)
Concrete Section Ans✓✓✓ (NG and USAR)
Construction Management Team (CMT?) Ans✓✓✓ Provides
recommendations on theater construction priorities and allocation of
assets
- Approval for final design for theater construction