questions with verified answers
2 types of radars? Ans✓✓✓ Q36 and Q37
An obstacle intent has 3 components Ans✓✓✓ Effect, Target, and
Location
Be able to determine and calculate # of turret defilade positions you
can make Ans✓✓✓ Use planning factors and tools.
Be able to determine the linear obstacle effort and total number of
minefields given a matrix Ans✓✓✓ Draw out linear obstacle effect and
figure out how many minefields you have to put in. Take your AA width
and multiply by the resource factor
Describe Engagement Area Development Ans✓✓✓ Steps
• ID all likely enemy avenues of approach
• Determine likely enemy schemes of maneuver
• Determine where to kill the enemy
• Plan and integrate obstacles
• Emplace weapon systems
• Plan and integrate indirect fires
• Rehearse the execution of the operations in the engagement area
, Describe restricted terrain Ans✓✓✓ Slows movement,
Difference between OPCON and attached? Ans✓✓✓ In attached,
gaining unit also provides sustainment.
Does paragraph 3 of a CO OPORD contain the TF Commanders intent
Ans✓✓✓ No, It contains the Concept of the Operation
Does the BN S4 control company supply trains? Ans✓✓✓ No, no he
doesn't.
During the Engineer Running Estimate, how many SOEOs must the
engineer develop Ans✓✓✓ One for each maneuver Course of Action
During which step of the MDMP process does the TF ENGINEER develop
the scheme of Engineer Operations? Ans✓✓✓ COA Development
Given 4X D7's, and 72 hours, calculate blade team hours avail and hull
defilade positions you can dig Ans✓✓✓ Okay, 144 blade team hours,
96 positions (USE PLANNING FACTORS AND TOOLS)
How does the EN CO CDR synchronize the maneuver in Engineer plans?
Ans✓✓✓ Makes sure EN PLT obstacles meet the TF CDR's intent