Asbestos Practice Exam 4 Questions With 100% Verified Answers When is it the safest to handle asbestos? - ANSWER when it is wet What is requried during asbestos training? - ANSWER - notice of the specific nature of the operations - notice of the increased risk of cancer w cigarettes - notices in spanish for spanish speaking workers --- NO - Notice of the history of asbestos use Workers have been standing in a contaminated area. If the lab tests took 9 days to complete and the results showed 5 fiters/cc and the contractor told the workers as soon as he found out the results, he proceeded - ANSWER incorrectly. he must notify them within 5 days of exposure. How many years must medical and monitoring records concerning asbestos exposure at a workplace be kept? - ANSWER 30 What areas are included in the post abatement cleanup? - ANSWER - areas needing recleaning after visual inspection - HEPA vaccuming or wet mopping all horizontal and vertical surfaces inside the work area. - two cleanings, one aftera min of 24 hours --- NOT = cleaning of surfaces outside the work area Supervisor must hold meetings w crews every ___ days. Contractor must have meetings w supervisors every ___ days. - ANSWER 10 working days and 30 days If crews have on street clothes with dry hair outside of site this is bad becasue - ANSWER it shows that crew has not showered If a contractor used a Megnehelic gauge with a scale of 0.0 to 0.5 inches of water and the pressure drop across a plastic barrier was measured from the insude by punching a small hole and inserting one end of a rubber tube leaving it open to the atmosphere with the other end attached to the low pressure tap of the instrument and he then reads the pressure directly from the scale, he has proceeded - ANSWER incorrectly, he should have measured from the outside When public schools have asbestos removed, which of the following areas is exempt from the regulations? - ANSWER None Cal/Osha must be notifed if a material has more than what percentage of asbestos (dry weight) and is cut, shoveled, sanded, blasted, ground, sawed, removed, or handled? - ANSWER .1 The employer must test the air if the asbestos concentration is over how many fibers/cc in an 8 hour period? - ANSWER .1 Using the membrane filter method for testing concentractions, what is the maximum exposre of asbestos fibers/cc air allowed in an 8 hour period? - ANSWER 0.2 The California Recommended Contract Specs states that in the event of a life threatening injury or illness, worker decontamination should have lesser priority than the workers health. If a worker in a heated area passes out and medical help is summoned, what is the next step? - ANSWER Stabilize the worker, remove him from the work place and secure proper medical treatment If a contractor conducts a patch test on a friable substrate to see if the encapsulant will penetrate sufficiently and applies the encapsulant with a paint roller, he has proceeded - ANSWER Incorrectly. It should not be rolled on. Contractor conducts an abatement at a public school and the crew conducts air monitoring for at least 8 hours during normal business activity. Samples are analyzed via TEM, abatement is conducted and final clearance is obtained at the level of .01 f/cc air before the school is reopened. The contractor proceeded - ANSWER .incorrectly, the contractor did not retest at least one month after reoccupancy of the school. What is the purpose of the patch test? - ANSWER To test the bonding characteristics of encapsulants If the PCM method was used to detect extremely small particles of asbestos this was - ANSWER incorrect. It does not detect

Show more Read less
Institution
Asbestos
Course
Asbestos









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Asbestos
Course
Asbestos

Document information

Uploaded on
May 13, 2025
Number of pages
15
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Asbestos Practice Exam 4 Questions
With 100% Verified Answers


When is it the safest to handle asbestos? - ANSWER when it is
wet

What is requried during asbestos training? - ANSWER - notice of
the specific nature of the operations
- notice of the increased risk of cancer w cigarettes
- notices in spanish for spanish speaking workers

--- NO - Notice of the history of asbestos use

Workers have been standing in a contaminated area. If the lab
tests took 9 days to complete and the results showed 5 fiters/cc
and the contractor told the workers as soon as he found out the
results, he proceeded - ANSWER incorrectly. he must notify
them within 5 days of exposure.

How many years must medical and monitoring records
concerning asbestos exposure at a workplace be kept? -
ANSWER 30

What areas are included in the post abatement cleanup? -
ANSWER - areas needing recleaning after visual inspection
- HEPA vaccuming or wet mopping all horizontal and vertical
surfaces inside the work area.
- two cleanings, one aftera min of 24 hours

, --- NOT = cleaning of surfaces outside the work area

Supervisor must hold meetings w crews every ___ days.
Contractor must have meetings w supervisors every ___ days. -
ANSWER 10 working days and 30 days

If crews have on street clothes with dry hair outside of site this is
bad becasue - ANSWER it shows that crew has not showered

If a contractor used a Megnehelic gauge with a scale of 0.0 to 0.5
inches of water and the pressure drop across a plastic barrier was
measured from the insude by punching a small hole and inserting
one end of a rubber tube leaving it open to the atmosphere with
the other end attached to the low pressure tap of the instrument
and he then reads the pressure directly from the scale, he has
proceeded - ANSWER incorrectly, he should have measured
from the outside

When public schools have asbestos removed, which of the
following areas is exempt from the regulations? - ANSWER None

Cal/Osha must be notifed if a material has more than what
percentage of asbestos (dry weight) and is cut, shoveled, sanded,
blasted, ground, sawed, removed, or handled? - ANSWER .1

The employer must test the air if the asbestos concentration is
over how many fibers/cc in an 8 hour period? - ANSWER .1
$14.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
TopGradeGuru
1.5
(2)

Also available in package deal

Thumbnail
Package deal
Asbestos EXAM BUNDLE Questions And Answers Verified 100% Correct
-
10 2025
$ 122.40 More info

Get to know the seller

Seller avatar
TopGradeGuru Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
10
Member since
11 months
Number of followers
0
Documents
2307
Last sold
3 days ago
GRADEHUB

We provide access to a wide range of professionally curated exams for students and educators. It offers high-quality, up-to-date assessment materials tailored to various subjects and academic levels. With instant downloads and affordable pricing, it's the go-to resource for exam preparation and academic success.

1.5

2 reviews

5
0
4
0
3
0
2
1
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions