APM PFQ Revision NEWEST 2025/2026 ACTUAL COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+

Institution
APM PFQ
Course
APM PFQ









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
APM PFQ
Course
APM PFQ

Document information

Uploaded on
May 9, 2025
Number of pages
13
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • apm pfq

Content preview

APM PFQ Revision

Analytical (backside-up) estimating - ANS-An estimating approach that makes use of specific
specifications to estimate time and value for every product or interest.

At what factors within the mission are distinct estimating strategies going for use? -
ANS-Different estimating methods are commonly carried out at special stages of the lifestyles
cycle. For instance, comparative estimating may be used in the course of the definition section
to provide extensive estimates with parametric and analytical estimating being used all through
development when extra element is available.

Benefit critiques - ANS-establishes whether or not the planned advantages were completely or
partially realised. It identifies any shortfalls and why they befell.

Benefits Management - ANS-The identification, definition, planning, monitoring and realisation
of commercial enterprise benefits

Change control in terms of scope management - ANS-Change manipulate is the procedure that
guarantees that every one changes are recognized, evaluated, approved, rejected or deferred.

Co-ordinator - ANS-Needed to cognizance on the crew's targets, draw out crew individuals and
delegate work appropriately.

Common traits of leaders - ANS-- can-do attitude
- equity
- persuasive
- commonplace feel
- imaginative and prescient

Communication - ANS-Communication is the manner through which statistics or instructions are
exchanged.
Successful conversation occurs whilst the obtained message is similar to the transmitted
message.

Comparative/analogous estimating - ANS-Uses information from previous tasks making
modifications primarily based on such things as size, complexity and skill degrees.

Complete finisher - ANS-Seeks out mistakes

, Configuration management when it comes to scope control - ANS-Encompasses the
administrative sports worried with the advent, upkeep, managed change and nice manipulate of
the scope of work.

Continual development - ANS-how records furnished by using high-quality assurance and great
manipulate procedures is used to force upgrades in efficiency and effectiveness

Cost Breakdown Structure (CBS) - ANS-Used to identify the exclusive styles of cost if you want
to be incurred by the undertaking.

Define the additives of the PESTLE acronym - ANS-Political, Economical, Social, Technological,
Legal, Environmental

Define the role of the sponsor and task manager in relation to the enterprise case - ANS-Project
sponsor owns the enterprise case and deliver course to the mission supervisor.

Define who is involved within the creation of the task control plan (stakeholders) - ANS-The
PMP is developed and owned with the aid of the task manager and accepted by way of the
challenge sponsor.

The governance board evaluation the PMP and undertaking crew individuals take authorship.

Deployment Baseline - ANS-The culmination of all of the 'planning' paintings documented within
the PMP

Describe the estimating funnel - ANS-Represents the increasing degrees of estimating accuracy
that may be completed via the stages of the lifecycle.

Describe the usage of a chance register - ANS-used to discover and track capability risks in a
challenge.

Cause = necessities will now not be finalised on time
Event = put off to the shipping of the work bundle
Effect = three-week postpone to the undertaking

Describe the use of an trouble log - ANS-A report of the issues that have took place at the
challenge.

Typically is it maintained by way of the undertaking manager and includes things having a
full-size impact at the probably project outcome.

Differentiate between an issue and a threat - ANS-Risk - there is a degree of uncertainty in the
occasion happening.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TutorHub Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
83
Member since
1 year
Number of followers
8
Documents
2105
Last sold
1 week ago

Welcome to Tutorhub ! The place to find the best study materials for various subjects. You can be assured that you will receive only the best which will help you to ace your exams. All the materials posted are A+ Graded. Please rate and write a review after using my materials. Your reviews will motivate me to add more materials. Thank you very much!

4.5

30 reviews

5
22
4
3
3
3
2
1
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions