100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

MICHIGAN BUILDERS LICENSE EXAM 2025 LATEST NEWEST UPDATE WITH ACTUAL QUESTIONS AND DETAILED VERIFIED ANSWERS WITH RATIONALES (100% CORRECT) //BRAND NEW!! /ALREADY GRADED A+ WITH GUARANTEED SUCCESS AFTER DOWNLOAD (ALL YOU NEED TO PASS YOUR EXAMS

Rating
-
Sold
-
Pages
67
Grade
A+
Uploaded on
14-04-2025
Written in
2024/2025

MICHIGAN BUILDERS LICENSE EXAM 2025 LATEST NEWEST UPDATE WITH ACTUAL QUESTIONS AND DETAILED VERIFIED ANSWERS WITH RATIONALES (100% CORRECT) //BRAND NEW!! /ALREADY GRADED A+ WITH GUARANTEED SUCCESS AFTER DOWNLOAD (ALL YOU NEED TO PASS YOUR EXAMS Insulation products (blown and sprayed) must be documented with: March 2011. The new Michigan codes took effect in 10. Below grade walls are insulated from the top of the basement wall down to _____ below grade, or the basement floor, whichever is less. Area weighted average. The _______ is the combined Solar Heat Gain Coefficient of all the glazed fenestration products in the building. Thermal insulation R-values Design criteria Equipment systems Plans and specifications must be detailed in regards to: 2009.

Show more Read less
Institution
Health Care
Course
Health Care











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Health Care
Course
Health Care

Document information

Uploaded on
April 14, 2025
Number of pages
67
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • michigan builders license

Content preview

MICHIGAN BUILDERS LICENSE
EXAM 2025 LATEST NEWEST
UPDATE WITH ACTUAL
QUESTIONS AND DETAILED
VERIFIED ANSWERS WITH
RATIONALES (100% CORRECT)
//BRAND NEW!! /ALREADY
GRADED A+ WITH
GUARANTEED SUCCESS AFTER
DOWNLOAD (ALL YOU NEED TO
PASS YOUR EXAMS



Insulation products (blown and sprayed) must be documented with:
March 2011.
The new Michigan codes took effect in

, 10.
Below grade walls are insulated from the top of the basement wall down to _____ below
grade, or the basement floor, whichever is less.
Area weighted average.
The _______ is the combined Solar Heat Gain Coefficient of all the glazed fenestration
products in the building.
Thermal insulation R-values
Design criteria
Equipment systems
Plans and specifications must be detailed in regards to:
2009.
In Michigan, the residential energy code is based on the _____ IECC, with certain
amendments.
Air leakage.
___________ is the rate of air infiltration in the presence of a specific pressure differential.
Windows
Attic access hatches
Recessed lights
Created to serve as a complete, comprehensive code regulating the construction of single-
family, two-family and buildings consisting of three or more townhouse units.
IRC (International Residential Code)
Administrative
First 2 chapters of code book are
True
Plans or supporting documents are almost always required by the controlling authority prior
to issuing a permit. T or F
Yes
Does the building official have the authority to render interpretations of the code?
8 foot fence.
None of the following require a permit, EXCEPT:
sidewalks and driveways

, tiling
an 8 foot fence
playground equipment
False
Tables and illustrations are always supported by information found in the written code and
footnotes. T or F
Live load.
The amount of evenly distributed weight imposed by inhabitants, goods and removable
objects on a floor or roof system is referred to as
True.
If a code requirement is in the book, it is both acceptable and enforceable by the code official.
T or F
Figures.
Illustrations are typically referred to as
Determine that buildings are built to the minimum enforceable standard.
Generally speaking, the building official's job is to
True.
According to code, concrete must reach at least 70% of it's ability within ____________days.
40%.
A stud used for a non-bearing partitions may not be notched more than ____% of the stud
width.
Additions, alterations, renovation and repairs.
The Michigan Uniform Energy code applies to new buildings as well as
U-factor.
___________ is a measure of how well the window or door assembly conducts heat. The
lower the number, the better insulation the assembly will provide.
50%.
Energy losses from recessed lighting fixtures can often reach ___% of the total thermal loss
of a ceiling.
R-3.

, Michigan requires a minimum thermal resistance of ____________for mechanical system
piping.
True.
Oversized HVAC equipment has a higher initial cost, a higher operating cost, provides less
comfort, and shorter life expectancy. T or F
Prescriptive Path.
_______ is the compliance route that applies Table 402.1.1 to building envelope components,
and is considered the most simple.
Area weighted averages.
___________ can be used to satisfy U-factor and SHGC requirements.
IC (Insulation Contact)
Recessed lights must be _____ rated.
True.
Up to 15 square feet of glazing per dwelling unit is exempted from U-value requirements. T
or F
Registered design professional.
The 2009 IECC requires a permanent certificate posted on the electrical distribution panel.
The certificate shall be completed by the builder or
State energy code requirements.
One hurdle contractors face when bidding for an energy efficient project is choosing
materials that fit the design, and also meet
False.
Historically significant buildings are not exempt from code changes. T or F
R-value
Settled thickness
Manufacturer name
It is required that all manufacturer instructions be at the jobsite at the time of inspection. T or
F
Kitchen.
All of the following are not considered habitable spaces EXCEPT:
bathrooms

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ESCALITothethinker Amazon
View profile
Follow You need to be logged in order to follow users or courses
Sold
177
Member since
1 year
Number of followers
39
Documents
1988
Last sold
1 week ago

3.2

40 reviews

5
15
4
3
3
8
2
1
1
13

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions