IRC TEST FULL IRC BUILDING CODE QUESTIONS WITH CORRECT ANSWERS
2023|ALREADY GRADED A+||BRAND NEW!!
The international residential code is applicable to single-family dwellings a maximum of
__________ Stories and above great plain height - (ANSWER)3
If there is a conflict in the code between the general requirement and the specific
requirement, the ____________ requirement shall apply. - (ANSWER)Specific
Provisions of the appendices do not apply unless ______________. - (ANSWER)Specifically
@#$%%$
adopted )(*&^
#$%^
34567897
______________ Is the term used in the IRC to describe the
654individual in charge of the
@#$%^&
department of building safety. - (ANSWER)Building official
*(*&^%
The building official has the authority to ______________ The provision of the code. -
-
(ANSWER)Interpret
09876543
45678
Used materials may be utilized under which one of the following conditions? -
(ANSWER)When approved by the building official
The building official has the authority to grant modifications to the code ________________. -
(ANSWER)For individual cases where the strict letter of the code is impractical
Unless supporting a surcharge, retaining walls have a maximum height of _________ Inches,
measured from the bottom of the footing to the top of the wall, do not require a permit. -
(ANSWER)48 inches
Test performed by ___________ May be required by the building official where there is
insufficient evidence of code compliance. - (ANSWER)An approved agency
,IRC TEST FULL IRC BUILDING CODE QUESTIONS WITH CORRECT ANSWERS
2023|ALREADY GRADED A+||BRAND NEW!!
Apartment is not required for the construction of a one-story detached accessory structure
when it has a maximum floor area of _________ Square feet. - (ANSWER)200
Pre-fabricated swimming pools are subject to a building permit where they have a
minimum depth of __________. - (ANSWER)24 inches
Unless an extension is authorized, apartment becomes invalid when work does not
@#$%%$
commence within _________ After permit issuance. - (ANSWER)180 days )(*&^
#$%^
34567897
The building permit or a copy of the permit, shall be kept654
__________ until completion of the
@#$%^&
project. - (ANSWER)At the job site
*(*&^%
When a building permit is issued, The construction document shall be approved
-
_____________. - (ANSWER)In writing or by stamp
09876543
45678
Unless otherwise mandated by state or local laws, the approved construction documents
shall be retained by the building official for a minimum of __________ From the date of
completion of the permitted work. - (ANSWER)180 days
Where applicable, which one of the following inspections is not specifically identified by
the international residential code as a required inspection? - (ANSWER)Energy efficiency
inspection
Who's duty is it to provide access to work in need of inspection? - (ANSWER)The person
requesting the inspection
The certificate of occupancy cell contain all of the following information except: -
(ANSWER)The maximum occupant load
,IRC TEST FULL IRC BUILDING CODE QUESTIONS WITH CORRECT ANSWERS
2023|ALREADY GRADED A+||BRAND NEW!!
A temporary certificate of occupancy is valid for what period of time? - (ANSWER)A period
set by the building official
The board of appeal is not authorized to rule on an appeal based on the claim that
___________. - (ANSWER)A code requirement should be waived
The membership of the board of appeals ___________ - (ANSWER)Shall be knowledgeable
@#$%%$
of building construction )(*&^
#$%^
34567897
A permit is not required for construction of a fence with654
a maximum height of ______ Feet. -
@#$%^&
(ANSWER)7
*(*&^%
When a stop work order is issued, it shall be given to any of the following individuals except
-
for the ___________. - (ANSWER)Permit application
09876543
45678
Which of the following standards is applicable for factory built fireplaces? - (ANSWER)UL
127-2011
All of the following issues are specifically identified for achieving the purpose of the
international residential code, except for ____________. - (ANSWER)Usability and
accessibility
A permit is not required for the installation of a window awning provided the awning project
a maximum of ___________ Inches from the exterior wall and does not require additional
support. - (ANSWER)54
ACI 318- 14 as a reference standard addressing ____________ - (ANSWER)Structural
concrete
, IRC TEST FULL IRC BUILDING CODE QUESTIONS WITH CORRECT ANSWERS
2023|ALREADY GRADED A+||BRAND NEW!!
Where is self-contained refrigeration system contains a maximum of ________ pound (s) Of
refrigerant, a permit is not required - (ANSWER)10
It is the duty of the __________ or their agent to notify the building official that work is ready
for inspection. - (ANSWER)Permit holder
What is the role of the building official in relationship to the board of appeals? -
@#$%%$
(ANSWER)Ex officio member )(*&^
#$%^
34567897
Were the enforcement of a code provision would violate654 the conditions of an appliance's
@#$%^&
listing, the condition of the listing ___________ . - (ANSWER)Shall apply
*(*&^%
Inspection reports shall be retained in the official records for what minimum period ? -
-
(ANSWER)The time required for the retention of public records
09876543
45678
Which of the following reasons is not specifically identified by the code as authority to
suspend or revoke a permit? - (ANSWER)Required inspections have not been performed
A permit for a temporary structure is limited as to time of service, but she'll not be allowed
for more than _______ Days. - (ANSWER)180 days
The issuance of a certificate of occupancy is not required for what maximum size of
accessory building? - (ANSWER)All accessory buildings are exempt
What is the weathering potential for all dwelling sites located in the state of Missouri? -
(ANSWER)Severe
The basic wind speed to be used for a majority of the United States is ____________. -
(ANSWER)115 mph
2023|ALREADY GRADED A+||BRAND NEW!!
The international residential code is applicable to single-family dwellings a maximum of
__________ Stories and above great plain height - (ANSWER)3
If there is a conflict in the code between the general requirement and the specific
requirement, the ____________ requirement shall apply. - (ANSWER)Specific
Provisions of the appendices do not apply unless ______________. - (ANSWER)Specifically
@#$%%$
adopted )(*&^
#$%^
34567897
______________ Is the term used in the IRC to describe the
654individual in charge of the
@#$%^&
department of building safety. - (ANSWER)Building official
*(*&^%
The building official has the authority to ______________ The provision of the code. -
-
(ANSWER)Interpret
09876543
45678
Used materials may be utilized under which one of the following conditions? -
(ANSWER)When approved by the building official
The building official has the authority to grant modifications to the code ________________. -
(ANSWER)For individual cases where the strict letter of the code is impractical
Unless supporting a surcharge, retaining walls have a maximum height of _________ Inches,
measured from the bottom of the footing to the top of the wall, do not require a permit. -
(ANSWER)48 inches
Test performed by ___________ May be required by the building official where there is
insufficient evidence of code compliance. - (ANSWER)An approved agency
,IRC TEST FULL IRC BUILDING CODE QUESTIONS WITH CORRECT ANSWERS
2023|ALREADY GRADED A+||BRAND NEW!!
Apartment is not required for the construction of a one-story detached accessory structure
when it has a maximum floor area of _________ Square feet. - (ANSWER)200
Pre-fabricated swimming pools are subject to a building permit where they have a
minimum depth of __________. - (ANSWER)24 inches
Unless an extension is authorized, apartment becomes invalid when work does not
@#$%%$
commence within _________ After permit issuance. - (ANSWER)180 days )(*&^
#$%^
34567897
The building permit or a copy of the permit, shall be kept654
__________ until completion of the
@#$%^&
project. - (ANSWER)At the job site
*(*&^%
When a building permit is issued, The construction document shall be approved
-
_____________. - (ANSWER)In writing or by stamp
09876543
45678
Unless otherwise mandated by state or local laws, the approved construction documents
shall be retained by the building official for a minimum of __________ From the date of
completion of the permitted work. - (ANSWER)180 days
Where applicable, which one of the following inspections is not specifically identified by
the international residential code as a required inspection? - (ANSWER)Energy efficiency
inspection
Who's duty is it to provide access to work in need of inspection? - (ANSWER)The person
requesting the inspection
The certificate of occupancy cell contain all of the following information except: -
(ANSWER)The maximum occupant load
,IRC TEST FULL IRC BUILDING CODE QUESTIONS WITH CORRECT ANSWERS
2023|ALREADY GRADED A+||BRAND NEW!!
A temporary certificate of occupancy is valid for what period of time? - (ANSWER)A period
set by the building official
The board of appeal is not authorized to rule on an appeal based on the claim that
___________. - (ANSWER)A code requirement should be waived
The membership of the board of appeals ___________ - (ANSWER)Shall be knowledgeable
@#$%%$
of building construction )(*&^
#$%^
34567897
A permit is not required for construction of a fence with654
a maximum height of ______ Feet. -
@#$%^&
(ANSWER)7
*(*&^%
When a stop work order is issued, it shall be given to any of the following individuals except
-
for the ___________. - (ANSWER)Permit application
09876543
45678
Which of the following standards is applicable for factory built fireplaces? - (ANSWER)UL
127-2011
All of the following issues are specifically identified for achieving the purpose of the
international residential code, except for ____________. - (ANSWER)Usability and
accessibility
A permit is not required for the installation of a window awning provided the awning project
a maximum of ___________ Inches from the exterior wall and does not require additional
support. - (ANSWER)54
ACI 318- 14 as a reference standard addressing ____________ - (ANSWER)Structural
concrete
, IRC TEST FULL IRC BUILDING CODE QUESTIONS WITH CORRECT ANSWERS
2023|ALREADY GRADED A+||BRAND NEW!!
Where is self-contained refrigeration system contains a maximum of ________ pound (s) Of
refrigerant, a permit is not required - (ANSWER)10
It is the duty of the __________ or their agent to notify the building official that work is ready
for inspection. - (ANSWER)Permit holder
What is the role of the building official in relationship to the board of appeals? -
@#$%%$
(ANSWER)Ex officio member )(*&^
#$%^
34567897
Were the enforcement of a code provision would violate654 the conditions of an appliance's
@#$%^&
listing, the condition of the listing ___________ . - (ANSWER)Shall apply
*(*&^%
Inspection reports shall be retained in the official records for what minimum period ? -
-
(ANSWER)The time required for the retention of public records
09876543
45678
Which of the following reasons is not specifically identified by the code as authority to
suspend or revoke a permit? - (ANSWER)Required inspections have not been performed
A permit for a temporary structure is limited as to time of service, but she'll not be allowed
for more than _______ Days. - (ANSWER)180 days
The issuance of a certificate of occupancy is not required for what maximum size of
accessory building? - (ANSWER)All accessory buildings are exempt
What is the weathering potential for all dwelling sites located in the state of Missouri? -
(ANSWER)Severe
The basic wind speed to be used for a majority of the United States is ____________. -
(ANSWER)115 mph