Oregon Construction Contractors CCB Test 2025

Institution
Oregon Construction
Course
Oregon construction











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Oregon construction
Course
Oregon construction

Document information

Uploaded on
April 2, 2025
Number of pages
32
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • oregon constructio
  • oregon

Content preview

Oregon Construction Contractors CCB Test 2025
Newest Questions and Answers () (Verified
Answers)

A person who engages in a business or activity that involves construction new water wells must
possess a license from the: - ANSWER-Oregon Water Resource Department (OWRD)

True or False
Prompt billing and prompt collections make for a healthier cash flow. - ANSWER-True

Oregon OSHA consultants WILL NOT: - ANSWER-Issue citations or propose penalties for violations of
OSHA standards.

1) Questions to answer when preparing your project schedule include all of these except:

- All of these are questions to ask
- What equipment will be needed?
- How long will each task take to complete?
- What type of crew will be needed to complete the activity? - ANSWER-- All of these are questions to
ask
- What equipment will be needed?
- How long will each task take to complete?
- What type of crew will be needed to complete the activity?

For Notice of Right Lien purpose, a commercial improvement is defined as: - ANSWER-A structure that
is not used or intended for use as a residential building

I am the residential original contractor and I provide labor and materials for the project. Who do I
need to give a notice of Right to Lien to? - ANSWER-Mortgagee

A quantity survey is also referred to as a: - ANSWER-Take Off

Tagout involves placing a warning tag: - ANSWER-On an energy-isolation device

Other than Take Off, other common construction estimate types include all, except: - ANSWER-
Ballpark Estimates

True or False
An on-site of host employer is responsible for ensuring a safe place of employment for leased or
temporary workers. - ANSWER-True

The state unemployment tax rate varies base on: - ANSWER-The history of unemployment claims
against the employer.

Stop work order violations can result in: - ANSWER-- Any of these could be the result of failure to
comply with a stop work order.
- Court action
- Permit or license revocation
- Civil penalties

The ___________________ gives an overview of the project, deadlines, and general requirements. -
ANSWER-Invitation to Bid

,"Job Logic" refers to: - ANSWER-The sequence of work

True or False
Self-employment taxes apply to all forms of business entities. - ANSWER-False

- Money earned and money spent are accounted for in the year they are received or paid, respectively.
- ANSWER-In the Cash Method

The Itemized Summary is the basis for: - ANSWER-A complete and accurate estimate of project costs
and lists all major items of work in the order they are to be performed.

A major difference between the EIN and the BIN is: - ANSWER-One is federal and one is state

Poor construction and storage practices can result in _________________ inside the structure walls. -
ANSWER-Molds and fungus

Builders now must use corrosion-resistance flashing in these specified locations, except: - ANSWER-
Surrounding all interior bedroom doors.

Compliance with environmental regulations can protect a contractor from:

- All of these are correct
- Private party lawsuits
- Criminal and civil penalties
- Liability claims - ANSWER-- All of these are correct
- Private party lawsuits
- Criminal and civil penalties
- Liability claims

Using the Quantity Take-Off method for estimating, you begin by estimating the cost of
_________________ for each individual task. - ANSWER-Labor and materials

Contractors must apply for permits through: - ANSWER-Their local building department

A cost effective method for managing material costs and keeping inventory costs down is the: -
ANSWER-JIT - Just In Time

These are materials prohibited form open burning in Oregon except for: - ANSWER-Unpainted and
untreated scrap wood

An owner-seller may comply with the Homebuyers Protection Act (HPA) by:

- Doing any of these
- Purchasing title insurance that does not exclude filed or unfiled claims of lien,
- Obtaining lien waivers or releases
- Retaining at least 25% of the sales price in escrow - ANSWER-- Doing any of these
- Purchasing title insurance that does not exclude filed or unfiled claims of lien,
- Obtaining lien waivers or releases
- Retaining at least 25% of the sales price in escrow

What are the possible consequences that a contractor may face if he or she fails to provide the
information to the Owner About Construction Liens when required?

- All of these are correct
- Contractor may be fined
- Contractor may lose lien rights
- Contractor may have CCB license suspended - ANSWER-- All of these are correct

,- Contractor may be fined
- Contractor may lose lien rights
- Contractor may have CCB license suspended

Withheld taxes are considered to be "_____________" funds that do not belong to the business and
cannot be used for any other purpose. - ANSWER-Trust

The major purpose of the building exterior shell is to: - ANSWER-Provide protection for the building at
its exterior boundaries and to enclose a suitable interior environment

A project manager can be involved in more than one construction project at the same time. -
ANSWER-True

The building exterior shell may consist of:

- All of these are part of the building exterior shell
- Only windows and doors
- Only exterior wall assemblies
- Only roof assemblies - ANSWER-- All of these are part of the building exterior shell
- Only windows and doors
- Only exterior wall assemblies
- Only roof assemblies

Who is responsible for preparing the SDS? - ANSWER-The chemical manufacturer

Project includes everything but: - ANSWER-Annual office staff salaries

True or False
"White goods" include water heater, refrigerator, kitchen stoves, dishwashers, washing machines,
and clothes dryers. - ANSWER-True

Under the completed contract method (CCM), these are deferred until the project is complete except:

- All of these are deferred until completion
- Profits of losses
- Revenue
- Costs - ANSWER-- All of these are deferred until completion
- Profits of losses
- Revenue
- Costs

_______________ is not part of the Project Closeout process - ANSWER-Posting formal notice of the
site safety rules.

The income statement, cash flow statement, and balance sheet are your business's
"______________" - ANSWER-Report cards

Minor labels is a less expensive permitting process available only to: - ANSWER-Licensed plumbing
and electrical contractors.

The building Code Division is supported by _____ committees. - ANSWER-7

A commercial specialty contractor level 1 endorsement requires a minimum of _______ years of
experience / qualifying substitute education. - ANSWER-8

A small commercial structure is:

, - All of these are small commercial structures
- Any appurtenance to a small commercial structure
- A nonresidential structure with a ground area of 10,000 square feet or less and the structure is not
more than 20 feet tall
- A nonresidential unit in a large structure if the unit is 12,000 square feet or less and the unit is not
more than 20 feet tall - ANSWER-- All of these are small commercial structures
- Any appurtenance to a small commercial structure
- A nonresidential structure with a ground area of 10,000 square feet or less and the structure is not
more than 20 feet tall
- A nonresidential unit in a large structure if the unit is 12,000 square feet or less and the unit is not
more than 20 feet tall

True or False
A license can change business entities without changing CCB license number(s). - ANSWER-False

Which of these is NOT a special entity license of certification: - ANSWER-Registered architect

A party is most likely to be considered an independent contractor if the party: - ANSWER-Is free from
direction and control, beyond the right of the service recipient to specify the desired result

Which of the following persons must have a contractor's license? - ANSWER-A person who for money
cleans chimneys

Which of these is not a violation subject to penalty from the CCB? - ANSWER-Failure to complete a job
on original deadline date

To file a complaint, an owner of a new structure has: - ANSWER-One year after the date the structure
was first occupied or two years after completion (whichever is first)

Complaints are accepted only when specific relationships exist, including:

- All of these are qualifying relationships
- The respondent contractor must have been licensed during all or part of the work period
- A direct contract relationship between the party filing the complaint and the contractor
- An employment relationship between the complainant and the employer - ANSWER-- All of these
are qualifying relationships
- The respondent contractor must have been licensed during all or part of the work period
- A direct contract relationship between the party filing the complaint and the contractor
- An employment relationship between the complainant and the employer

True or False
A material or equipment supplier can file a complaint through the CCB against a licensed contractor
for non-payment of materials purchased. - ANSWER-True

True or False
The CCB will accept and determine damages against an unlicensed contractor. - ANSWER-False

True or False
AN exempt contractor may employ as many individuals as desired regardless as to whether the
employees are family members. - ANSWER-False

Which of the following individuals is NOT required to have a contractor's license?

- None of these are required to have a contractor's license
- An owner who contracts for work to be performed by a licensed contractor
- A registered architect

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AndrewBenson Johns Hopkins University
View profile
Follow You need to be logged in order to follow users or courses
Sold
20
Member since
1 year
Number of followers
0
Documents
1950
Last sold
1 month ago

3.0

2 reviews

5
1
4
0
3
0
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions