Contractors | Practice Questions And Answers Rated
A+ | 2025/2026 Guide
The purpose of Construction Quality Management is to
- Correct Answer - Achieve the quality established by properly developed
requirements through the combined responsibility, but separate, efforts
of contractors and government personnel
Testing is extremely important in construction quality management and
is performed by
- Correct Answer - Both the contractor and the government
The primary purpose of the Three-Phase Control System is to
- Correct Answer - Require the contractor to plan, schedule, and perform
quality management actions to assure work meets all specified quality
standards
Quality Assurance Personnel have the responsibility to
- Correct Answer - Require the contractor to maintain the quality
specified in the plans and specifications
, The _________________ is the appropriate time to assure that all
materials and/or equipment have been tested, submitted, and approved
- Correct Answer - Preparatory Phase
The Preconstruction Conference and Coordination and Mutual
Understanding Meeting Are
- Correct Answer - Conducted prior to the commencement of any
physical construction work
Contractor testing procedures:
- Correct Answer - Are specified in the technical specs, outlined in the
QCP, and addressed at Coordination and Mutual Understanding Meeting
The Quality Control Plan contains
- Correct Answer - Identification of individual quality quality control
personnel, including name, qualifications, assigned duties,
responsibilities and authorities.
Tests that are unannounced, randomly performed, and repeat quality
control tests are
- Correct Answer - Quality assurance tests
The contractor is required to conduct a Preparatory Phase Meeting
before they begin any definable feature of work except when