100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CSLB CONCRETE C8 LICENSE PRACTICE TEST 1,2,3 AND 4 NEWEST 2025 EXAM NEWEST COMPLETE 300 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) ALREADY GRADED A+BRAND NEW!!.pdf

Rating
-
Sold
-
Pages
71
Grade
A+
Uploaded on
27-03-2025
Written in
2024/2025

CSLB CONCRETE C8 LICENSE PRACTICE TEST 1,2,3 AND 4 NEWEST 2025 EXAM NEWEST COMPLETE 300 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) ALREADY GRADED A+BRAND NEW!!.pdf

Institution
Course











Whoops! We can’t load your doc right now. Try again or contact support.

Connected book

Written for

Course

Document information

Uploaded on
March 27, 2025
Number of pages
71
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CSLB Law & Business Set 1 m m m m m




Question 1: m


How must a client submit a claim for service or repair of a defect on fit and fini
m m m m m m m m m m m m m m m m m


sh items after a remodel?
m m m m


A.) by certified mail
m m




B.) by overnight mail
m m




C.) by personal deliverym m




D.) any of the above m m m


(Ans- D. A client may use the normal customer-
m m m m m m m m


service procedures agreed to between the client and the contractor, but th
m m m m m m m m m m m


e client must notify the contractor of the defect in writing by certified mail,
m m m m m m m m m m m m m m


overnight mail, or personal delivery before the client may file an action in c
m m m m m m m m m m m m m


ourt.

Question 2: m


What is the maximum allowed travel distance from any point of a work are
m m m m m m m m m m m m m


a to a fire extinguisher?
m m m m




a.) 25mfeet

b.) 50mfeet

c.) 75mfeet

d.) 150mfeet
m (Ans- 75 feet m m




When should you renew contractors bond? (Ans-
m m m m m m


30 days before bond expires
m m m m m




Question 4: m

,If, during excavation, you unearth human remains or burial artifacts at a constr
m m m m m m m m m m m m


uction site, what should you do?
m m m m m




Click here to select answer B. Not
m m m m m m


ify the owner of the property.
m m m m m




mClick here to select answer B.
m m m m m


Stop work and place a warning ribbon three feet from the remains around t
m m m m m m m m m m m m m


he perimeter of the site.
m m m m




mClick here to select answer C. St
m m m m m m


op work immediately at that site.
m m m m m




mClick here to select answer D.
m m m m m


Stop work immediately at that site and any other nearby area that may
m m m m m m m m m m m m m


have remains. m


(Ans-
mStop work immediately at that site and any other nearby area that may ha
m m m m m m m m m m m m m


ve remains.
m




Question 5: m


Direct costs are $37,000, overhead is 12%, and profit is 5%. What is the s
m m m m m m m m m m m m m m


elling price? m


mClick here to select answer A.
m m m m m


$39,272.47

mClick here to select answer B.
m m m m m


$41,373.45

mClick here to select answer C.
m m m m m


$43,383.37

mClick here to select answer D.
m m m m m


$44,578.31
(Ans-
mD. The following solution is based on one of the references listed in the C
m m m m m m m m m m m m m m


SLB Study Guide. The solution may seem unorthodox, but you must
m m m m m m m m m m

,follow each step to arrive at the State's answer. Sum of overhead and profi
m m m m m m m m m m m m m


t percentages = 12% + 5% = 17% Percent of selling price that is direct cos
m m m m m m m m m m m m m m m


ts
= 100% - 17% = 83% = .83 Selling price = $37,000 ÷ .83 = $44,578.31 To
m m m m m m m m m m m m m m m m


check these calculations, add the subtotals: Direct costs = $44,578.31 ×
m m m m m m m m m m


.83 = $37,000.00 Overhead = $44,578.31 × .12 = $5,349.40 Profit =
m m m m m m m m m m m


$44,578.31 × .05 = $2,228.92 $37,000.00 + $5,349.40 + $2,228.92 =
m m m m m m m m m m


$44,578.32

Who pays FUTA? m m


a. employer
b. employee
c. 50% employer and 50% employee
m m m m


d. 90% employer and 10% employeem m m m


m(Ans- A.) Employer m m




When you get an approved set of plans, what should you do first?
m m m m m m m m m m m m


(Ans- Read any notes from the building department.
m m m m m m m m




Of the following, which is best for determining the number of hours require
m m m m m m m m m m m m


d for different phases of a project and for making sure the job is on schedul
m m m m m m m m m m m m m m m


e? (Ans- critical path method
m m m m




Which of the following provisions may not be included in a home improvem
m m m m m m m m m m m m


ent contract?
m




Click here to select answer A.
m m m m m m


Owner must pay for materials after they are delivered.
m m m m m m m m




Click here to select answer B.
m m m m m m


Owner must pay for materials before they are delivered.
m m m m m m m m




mClick here to select answer C.
m m m m m


The contractor may require a downpayment.
m m m m m

, mClick here to select answer D. Owne
m m m m m m


r may make progress payments.
m m m m


(Ans- Owner must pay for materials before they are delivered.
m m m m m m m m m




B. The CONTRACTORS LICENSE LAW states: It is against the law for
m m m m m m m m m m m m


a contractor to collect payment for work not yet completed, or for materi
m m m m m m m m m m m m


als not yet delivered. However, a contractor may require a downpaymen
m m m m m m m m m m


t.

How many times may you take the contractor's license exam before your origi
m m m m m m m m m m m m


nal application is voided?
m m m


(Ans- as many times as necessary within 18 months
m m m m m m m m




If it is discovered that the construction materials in an area contain more th
m m m m m m m m m m m m m


an 0.1% asbestos:
m m


Click here to select answer A
m m m m m


the crew should try not to disturb the area but keep working.
m m m m m m m m m m m


mClick here to select answer B
m m m m m


the contractor should contact DOSH immediately.
m m m m m


Click here to select answer C
m m m m m


the workers should stop and remove the materials wearing masks and glov
m m m m m m m m m m m


es.
Click here to select answer D
m m m m m


the crew should wet down the area with water and continue working
m m m m m m m m m m m


. (Ans- the contractor should contact DOSH immediately.
m m m m m m m




B. Any manufactured material containing more than one-
m m m m m m m


tenth of one percent (0.1%) asbestos by weight meets the definition of "as
m m m m m m m m m m m m


bestos-
mcontaining material"." Even if the surface area of these materials is less th
m m m m m m m m m m m m


an 100 square feet, the contractor must file a report with the Occupational
m m m m m m m m m m m m m


Carcinogen Control Unit of DOSH. m m m m




Which of the following are the most effective when used together on a priv
m m m m m m m m m m m m m


ate works project?
m m


Click here to select answer A
m m m m m


stop payment notice and mechanics lien
m m m m m
$20.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
REVISIONGENIUS Teachme2-tutor
Follow You need to be logged in order to follow users or courses
Sold
17
Member since
8 months
Number of followers
0
Documents
501
Last sold
1 month ago

4.7

736 reviews

5
577
4
127
3
21
2
8
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions