FE Civil Review Exam Questions and Answers 100% Pass A critical path on a construction activity schedule occurs when ___________ equals 0. - Float Use the ___________ ___________ theorem to find moment of inertia of a composite shape - Parallel axis Select all that apply. Which of the following devices is typically used as a way to implement temporary erosion control? A. Hay bales B. Geotextile C. Silt fence D. Check dam - Hay bales, silt fence, check dam Select all that apply. The following is generally true of or describes viscosity: A. a quantity expressing magnitude of internal friction, as measured by the force per unit area resisting a flow B. a measure of its resistance to deformation at a given rate C. Is lower for syrup than for water D. Higher when turbulent forces dominate E. Important in determining the friction factor F. Ratio of internal to viscous forces - A, B, E A statically determinate structure (such as a beam) occurs when the number of reaction forces (greater than, equal to, less than) than the number of equilibrium equations 2© EMILY CHARLENE YEAR , ALL RIGHTS RESERVED available - Equal to and less than ( 6 reactions with 3 equilibrium equations is statically INDETERMINATE) What is static friction? - It's the force that prevents an object from changing from a stationary state to the object being in motion How many Pascals are in 1 MPa? - 1,000,000 What is a design-build project delivery method? - The project owner hires one company that will handle the building, designing, and the hiring of the trade subcontractors. Often used in large projects where expedited project completion is highly important e.g. dam repair, bridge repair, etc What is a design-bid-build project delivery method? - The project owner hires the designer company and the builder company separately. And the builder company hires the trade subcontractors. This is the simplest and most common method What is a construction manager agency (CMA) project delivery method? - The project owner hires the designer company and the builder company separately, like D- B-B. However, the builder company also advises the owner how the owner should handle contract with the designer company. Which of the following statements best describes steel-beam column members? A. Steel beam-column members support axial compression loading and bending effects B. Steel beam-column members only support axial compression loadings and no bending effects C. Steel beam-column members do not exist - A What does a non disclosure agreement typically ask for its signees to do? - To keep secret details about the project that could jeopardize the client's interests 3© EMILY CHARLENE YEAR , ALL RIGHTS RESERVED The life-cycle coating method includes the initial cost and what other cost value? A. Green construction cost B. Present value of periodic repair costs and operating costs C. Carbon emission costing D. Accelerated construction cost - B. If a licensee has no conflict of interest with a service provided, but it may appear that there is a conflict of interest, is the licensee still required to disclose it to their clients or employees? (Y/N) - Yes Engineers may issue subjective statements if such statements are indicated as so (T/F) - False. Licensees shall be objective and truthful in professional reports, statements, or testimony. What is a sunk cost - a cost that has already been paid and cannot be recovered What are variable costs? - Costs that vary based on production volume Every state in the US has its own coordinate system (T/F) - True. Every state has its own state plane coordinate system. Select all that apply. Which of the following is a mechanical pr

Show more Read less
Institution
FE Civil
Course
FE Civil










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
FE Civil
Course
FE Civil

Document information

Uploaded on
March 25, 2025
Number of pages
27
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

FE Civil Review Exam Questions and
Answers 100% Pass

A critical path on a construction activity schedule occurs when ___________ equals 0. -
✔✔Float

Use the ___________ ___________ theorem to find moment of inertia of a composite
shape - ✔✔Parallel axis

Select all that apply. Which of the following devices is typically used as a way to
implement temporary erosion control? A. Hay bales B. Geotextile C. Silt fence D. Check
dam - ✔✔Hay bales, silt fence, check dam

Select all that apply. The following is generally true of or describes viscosity:

A. a quantity expressing magnitude of internal friction, as measured by the force per
unit area resisting a flow

B. a measure of its resistance to deformation at a given rate

C. Is lower for syrup than for water

D. Higher when turbulent forces dominate

E. Important in determining the friction factor

F. Ratio of internal to viscous forces - ✔✔A, B, E

A statically determinate structure (such as a beam) occurs when the number of reaction
forces (greater than, equal to, less than) than the number of equilibrium equations



© EMILY CHARLENE YEAR 2025-2026, ALL RIGHTS RESERVED 1

,available - ✔✔Equal to and less than ( 6 reactions with 3 equilibrium equations is
statically INDETERMINATE)

What is static friction? - ✔✔It's the force that prevents an object from changing from a
stationary state to the object being in motion

How many Pascals are in 1 MPa? - ✔✔1,000,000

What is a design-build project delivery method? - ✔✔The project owner hires one
company that will handle the building, designing, and the hiring of the trade
subcontractors. Often used in large projects where expedited project completion is
highly important e.g. dam repair, bridge repair, etc

What is a design-bid-build project delivery method? - ✔✔The project owner hires the
designer company and the builder company separately. And the builder company hires
the trade subcontractors. This is the simplest and most common method

What is a construction manager agency (CMA) project delivery method? - ✔✔The
project owner hires the designer company and the builder company separately, like D-
B-B. However, the builder company also advises the owner how the owner should
handle contract with the designer company.

Which of the following statements best describes steel-beam column members?

A. Steel beam-column members support axial compression loading and bending effects

B. Steel beam-column members only support axial compression loadings and no
bending effects

C. Steel beam-column members do not exist - ✔✔A

What does a non disclosure agreement typically ask for its signees to do? - ✔✔To keep
secret details about the project that could jeopardize the client's interests




© EMILY CHARLENE YEAR 2025-2026, ALL RIGHTS RESERVED 2

, The life-cycle coating method includes the initial cost and what other cost value?

A. Green construction cost

B. Present value of periodic repair costs and operating costs

C. Carbon emission costing

D. Accelerated construction cost - ✔✔B.

If a licensee has no conflict of interest with a service provided, but it may appear that
there is a conflict of interest, is the licensee still required to disclose it to their clients or
employees? (Y/N) - ✔✔Yes

Engineers may issue subjective statements if such statements are indicated as so (T/F) -
✔✔False. Licensees shall be objective and truthful in professional reports, statements, or
testimony.

What is a sunk cost - ✔✔a cost that has already been paid and cannot be recovered

What are variable costs? - ✔✔Costs that vary based on production volume

Every state in the US has its own coordinate system (T/F) - ✔✔True. Every state has its
own state plane coordinate system.

Select all that apply. Which of the following is a mechanical property of metals (hint:
listed in FE manual)

A. Elastic modulus

B. Ductility

C. Tensile strength

D. Yield strength

E. Creep



© EMILY CHARLENE YEAR 2025-2026, ALL RIGHTS RESERVED 3

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EmilyCharlene Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
442
Member since
2 year
Number of followers
139
Documents
21009
Last sold
1 day ago
Charlene\'s Scholastic Emporium.

Your Actual and Virtual Exam Tests Excellent Tutor.

3.6

96 reviews

5
44
4
13
3
15
2
7
1
17

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions