100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

PRESTRESSED CONCRETE DESIGN EXAM 2025 | ALL QUESTIONS AND CORRECT ANSWERS | ALREADY GRADED A+ | VERIFIED ANSWERS | LATEST EXAM

Rating
-
Sold
-
Pages
25
Grade
A+
Uploaded on
22-03-2025
Written in
2024/2025

PRESTRESSED CONCRETE DESIGN EXAM 2025 | ALL QUESTIONS AND CORRECT ANSWERS | ALREADY GRADED A+ | VERIFIED ANSWERS | LATEST EXAM

Institution
PRESTRESSED CONCRETE DESIGN
Course
PRESTRESSED CONCRETE DESIGN










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
PRESTRESSED CONCRETE DESIGN
Course
PRESTRESSED CONCRETE DESIGN

Document information

Uploaded on
March 22, 2025
Number of pages
25
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

PRESTRESSED CONCRETE DESIGN EXAM 2025 | ALL
QUESTIONS AND CORRECT ANSWERS | ALREADY
GRADED A+ | VERIFIED ANSWERS | LATEST EXAM

A contractor pursuing approval for submittal items prior to construction ------
---CORRECT ANSWER-----------------shop drawings and design drawings
showing detailed engineering and installation



The transition between the corrosion protection for the bond and free
stressing lengths shall be designed to ensure ---------CORRECT ANSWER-
----------------continuous protection from corrosive attack



The following responsibilities must be assigned before started a rock and
soil anchor project,with the exception of ---------CORRECT ANSWER---------
--------a final punchlist for initiating the warranty of the system



If grout is used to protect the outside of a steel trumpet, a minimum cover
of __ is required ---------CORRECT ANSWER-----------------2 inches



The use of UV- resistant coating bearing plates is ---------CORRECT
ANSWER-----------------permitted as an alternate to a galvanized plate



A coupler used in an anchorage system must be sealed to either the
encapsulation or the tendon sheath using ---------CORRECT ANSWER------
-----------a heat shrink sleeve

,The connection between the trumpet and the bearing plate must ---------
CORRECT ANSWER-----------------be watertight



The prestressing steel in the free length area is protected by ---------
CORRECT ANSWER-----------------a corrosion- inhabiting comound,grout
encasement,and the trumpet



When encapsulation in not available under class I conditions, the contractor
or installer ---------CORRECT ANSWER-----------------is permitted to use an
epoxy- coated strand that has passed the appropriate water pressure test



Type II Portland cement shall be used for grouting anchor system provided
that ---------CORRECT ANSWER-----------------the sulfate content is
between 0.1 and 0.2 percent



Grout socks must conform to ---------CORRECT ANSWER-----------------
ASTM D 4751



Plastic tubing wall thickness is acceptable for use in anchorage systems
when ---------CORRECT ANSWER-----------------its normal thickness for
PVC os .040 inches



The test method for the melting point of wax ---------CORRECT ANSWER---
--------------is ASTM D-566

, A trumpet should have a minimal wall thickness of ---------CORRECT
ANSWER-----------------.125 inches



A permanently free stressing length in a soil anchor can be protected by all
of the following except ---------CORRECT ANSWER-----------------epoxy



The minimum free stressing length for a prestressing steel bar is ---------
CORRECT ANSWER-----------------10 feet



Centralizers in an anchorage system should be spaced ---------CORRECT
ANSWER-----------------at 10 feet on center or less



The corrosion protection surrounding the unbonded length of the tendon ---
------CORRECT ANSWER-----------------shall not contact the bearing plate or
the anchorhead



___ are approved for repair on damaged corrugated sheath ---------
CORRECT ANSWER-----------------a heat shrink sleevs or heat shrink tape



Drill bits used to drill a hole for an anchor ---------CORRECT ANSWER-------
----------must not be more than 1/8th-inch smaller than the diameter of the
drill hole



The temperature of grout at the time of the placement must ---------
CORRECT ANSWER-----------------not exceed 90A when ambient
temperatures rise above 100A and be balanced with the use of a suitable

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
StudyWay Capella University
View profile
Follow You need to be logged in order to follow users or courses
Sold
106
Member since
2 year
Number of followers
43
Documents
1828
Last sold
2 days ago
INVEST AND UNLEASH THE POWER OF KNOWLEDGE NOW!

THIS PREMIUM STUVIA ACCOUNT GIVES YOU ACCESS TO EXCLUSIVE EXAMS, FLASH CARDS, TEST BANKS, AND STUDY GUIDES TAILORED FOR YOUR SUCCESS. ELEVATE YOUR GRADES, ACCELERATE YOUR LEARNING, AND SUPERCHARGE YOUR STUDIES: DIVE INTO A WORLD OF ACADEMIC EXCELLENCE!

4.5

59 reviews

5
46
4
5
3
3
2
2
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions