100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

SAFe POPM 6.0 EXAM 2025| BRAND NEW ACTUAL EXAM WITH 100% VERIFIED QUESTIONS AND CORRECT SOLUTIONS| GUARANTEED VALUE PACK| ACE YOUR GRADES.

Rating
-
Sold
-
Pages
44
Grade
A+
Uploaded on
18-03-2025
Written in
2024/2025

SAFe POPM 6.0 EXAM 2025| BRAND NEW ACTUAL EXAM WITH 100% VERIFIED QUESTIONS AND CORRECT SOLUTIONS| GUARANTEED VALUE PACK| ACE YOUR GRADES.

Institution
SAFe POPM 6.0
Course
SAFe POPM 6.0











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
SAFe POPM 6.0
Course
SAFe POPM 6.0

Document information

Uploaded on
March 18, 2025
Number of pages
44
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

1|Page



SAFe POPM 6.0 EXAM 2025| BRAND NEW ACTUAL
EXAM WITH 100% VERIFIED QUESTIONS AND
CORRECT SOLUTIONS| GUARANTEED VALUE PACK|
ACE YOUR GRADES.



What is one benefit of constant customer feedback?

A) Fast learning cycles

B) It reduces the need for face-to-face collaboration

C) Teams can better align working days with a customer's schedule

D) It reduces the amount of changes to the Features - (answers)A) Fast learning
cycles



Which statement describes the Scaled Agile Framework?

A) It scales Scrum to multiple Agile Teams

B) It provides guidelines for Project Managers

C) It provides strict guidelines for all daily activities

D) It synchronizes alignment, collaboration, and delivery for large numbers of
teams - (answers)D) It synchronizes alignment, collaboration, and delivery for
large numbers of teams



The Work-in-Process limit at the Analyzing step of the ART Kanban is based on the
overall availability of Product Management, other subject matter experts, and the
capacity of which two other roles? (Choose two.)

A) Lean Agile Center of Excellence

,2|Page


B) Release Train Engineer

C) Business Owners

D) System Architects

E) Agile Portfolio Operations - (answers)C) Business Owners

D) System Architects



Features in ART Backlogs can result from what?

A) Decomposing Enabler Stories

B) Splitting Epics or Capabilities

C) Aggregating stories into Features

D) Refining the Team Backlog - (answers)B) Splitting Epics or Capabilities



Which statement is true about fast feedback?

A) It supports SAFe Lean-Agile Principle #3 - Assume variability, preserve options

B) The shorter the feedback cycle, the higher the utilization

C) It accelerates planning and delivery

D) Smaller batch sizes enable faster feedback loops - (answers)A) It supports SAFe
Lean-Agile Principle #3 - Assume variability, preserve options



Which two types of items are maintained in the Team Backlog? (Choose two.)

A) Business Epics

B) Enabler Stories

,3|Page


C) User Stories

D) PI Objectives

E) Epic Enablers - (answers)B) Enabler Stories

C) User Stories



Product Managers are expected to collaborate in planning the amount of
upcoming Enabler work by establishing what?

A) Team Backlog prioritization

B) Capacity allocation

C) Accurate user story sizing

D) Completed Epic acceptance criteria - (answers)B) Capacity allocation



The team is struggling to agree on the story point sizing of a new user story. The
PO was previously a related domain expert and feels the team is wasting time.
What should she do?

A) Instruct the SM to resize the story

B) Continue to support the team's decision on sizing

C) Make the team aware of her expertise and decide the size for them

D) Suggest the team stop the sizing of the user story and add it to the next
iteration as is - (answers)B) Continue to support the team's decision on sizing



True or False: Epics are estimated in story points rolled up from feature estimates

A) True

, 4|Page


B) False - (answers)A) True



How frequently should the ART Backlog be reviewed?

A) Every week

B) When the Epic owners are defining the Epic Value Statement

C) Continuously

D) Before every PI - (answers)C) Continuously



The first three elements of the Continuous Delivery Pipeline work together to
support delivery of small batches of new functionality. These continuous
elements include Exploration, Integration, and what else?

A) Deployment

B) Automation

C) Execution

D) Compliance - (answers)A) Deployment



Why would Product Owners and Product Managers be key collaborators in the
enterprise?

A) They are key roles in steering and sequencing the Agile Release Train priorities

B) They plan all the key events for the Planning Increment

C) They provide governance and spending practices for the value streams

D) They plan Portfolio strategy horizons for the enterprise - (answers)A) They are
key roles in steering and sequencing the Agile Release Train priorities
Free
Get access to the full document:
Download

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
Nelly003

Get to know the seller

Seller avatar
Nelly003 Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
254
Member since
1 year
Number of followers
2
Documents
3052
Last sold
4 days ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions