Risk - 🧠ANSWER ✔✔a factor that could result in future negative
consequences
Level of risk - 🧠ANSWER ✔✔Probability of risk occurring x impact if it did
happen
Project risks - 🧠ANSWER ✔✔Supplier issues, skill or staff shortage,
personal issues, requirement issues, test environments not ready, low
quality of design, code, and tests
Product risks - 🧠ANSWER ✔✔Failure prone software delivered, potential
for a defect to cause harm, poor software characteristics, software that
doesn't do what it is supposed to
Risk-based testing - 🧠ANSWER ✔✔Proactively reduces the risk by
identifying them and mitigating them as soon as possible
COPYRIGHT©PROFFKERRYMARTIN 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY STATEMENT.
ALL RIGHTS RESERVED
1
, Risk-based approach - 🧠ANSWER ✔✔1) Determines test techniqes and
the extent of testing needed
2) Prioritize testing in an attempt to find critical defects as early as possible
3) Determines non-testing techniques that could reduce risk
Test leader tasks - 🧠ANSWER ✔✔1) Coordinating the development of the
test strategy and plan with project managers
2) Writing or reviewing test strategies
3) Contributing testing perspective to other project activities
4) Planning the development of the required tests
5) Taking required action on issues
6) Scheduling testing activities
Tester tasks - 🧠ANSWER ✔✔1) Reviewing and contributing to
development of test plans
2) Analyzing, reviewing, and assessing user requirements
3) Creating test specifications
4) Setting up the test environment