100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

C-10 Electrical Part 1 Questions and Answers Latest Update

Rating
-
Sold
-
Pages
15
Grade
A+
Uploaded on
02-03-2025
Written in
2024/2025

C-10 Electrical Part 1 Questions and Answers Latest Update

Institution
C-10 Electrical
Course
C-10 Electrical









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
C-10 Electrical
Course
C-10 Electrical

Document information

Uploaded on
March 2, 2025
Number of pages
15
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

C-10 Electrical Part 1 Questions and Answers
Latest Update
Practice questions for this set




2
___




167. Allowable load current will be derated
_____ on
to 50% of normal capacity when there are 4
jobs.
___




Don't know?

, 1. Takeoffs of conduit are Power distribution, branch lighting, and branch power
categorized into ___ _.

2. Raceways are taken off per ___ _. Linear foot, each
Fittings required to make turns and
extensions are taking off per _ _.

3. All wires and conductors are taken Linear foot
off per __ _.

4. All fittings, devices and boxes are Each Item
taken off per _ _.

5. Permits and fees for tie-ins may be Occurrence,Project, and Contract
listed at lump sum and are taken off
per __ _.

6. Control stations are taken off by Individual Unit and Each Item.
_______.

7. Panelboards are taken off Type, Size, and Voltage
individually according to ___ _.

8. Starters, safety switches and fuses Each Item
are taken off per ___ _.

9 _____ should be kept separate Exit Lighting
from general light fixtures.

10. Interior and exterior lighting Separately
should be taken off and listed ____ _.

11. Lamps for light fixtures are ____ _. Taken off per each Item

12. Light fixtures should be listed in Color
the takeoff according to _ _.

13. Working electrical drawings Telecommunications and security systems only
numbered sequentially, prefaced by
the letter "E", include __ _.

14. The _____ shows power Power plan
requirements of the structure.

15. The _____ aids the electrical Panel Schedule
contractor sizing the panel.

16. The _____ plan is supplemented Lighting
by the fixture schedule.

17. The fixture schedule lists lamp Wattage
_______.

18. Electrical specifications provide The grade of materials to be used, Materials installation specifics, and
_______. how materials will be used in the finished system

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Boffin Harvard University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1769
Member since
4 year
Number of followers
1469
Documents
7146
Last sold
1 week ago
Pilot Study

Prevent resits and get higher grades.

3.8

436 reviews

5
210
4
76
3
70
2
16
1
64

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions