Common standard time period for station battery to handle outage of AC
power to chargers - 🧠ANSWER ✔✔8-12 hours
Time to restore data exchange redundancy when redundancy testing by
RC/TOP/BA deemed unsuccessful - 🧠ANSWER ✔✔2 hours
Transition period to backup control facility (fully functioning) - 🧠ANSWER
✔✔2 hours
Annual testing of backup control facility must prove to be functional for this
long - 🧠ANSWER ✔✔2 hours
Every 2 years TO/TOP/DSP must provide how many hours of system
restoration training to field switching personnel - 🧠ANSWER ✔✔2 hours
Every 2 years GOP's with blackstart resources shall provide how many
hours of training to operating personnel responsible for startup -
🧠ANSWER ✔✔2 hours
COPYRIGHT©NINJANERD 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY 1
STATEMENT. ALL RIGHTS RESERVED
, BAL-002 default contingency reserve restoration period (following
disturbance recovery period) - 🧠ANSWER ✔✔90 minutes
How often should BA calculate and record inadvertent interchange -
🧠ANSWER ✔✔60 minutes/hourly
How often should BA provide MW-hour meter readings to adjacent BA's -
🧠ANSWER ✔✔60 minutes/hourly
TLR procedure (identifying TLR level and actions to be implemented)
needs updating how often - 🧠ANSWER ✔✔60 minutes/hourly
Hourly ATC for next 48 hours calculated how often - 🧠ANSWER ✔✔60
minutes/hourly
During EEA2/3 the energy deficient entity needs to update the RC how
often until alert is terminated - 🧠ANSWER ✔✔60 minutes/hourly
DOE-417 (disturbance reporting) should be completed by when -
🧠ANSWER ✔✔60 minutes
BA with loss of resources must submit RFI with start time no more than
how far beyond the resource loss - 🧠ANSWER ✔✔60 minutes
COPYRIGHT©NINJANERD 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY 2
STATEMENT. ALL RIGHTS RESERVED
Questions and Corresponding Answers
with Surety of 100% Pass Mark
Common standard time period for station battery to handle outage of AC
power to chargers - 🧠ANSWER ✔✔8-12 hours
Time to restore data exchange redundancy when redundancy testing by
RC/TOP/BA deemed unsuccessful - 🧠ANSWER ✔✔2 hours
Transition period to backup control facility (fully functioning) - 🧠ANSWER
✔✔2 hours
Annual testing of backup control facility must prove to be functional for this
long - 🧠ANSWER ✔✔2 hours
Every 2 years TO/TOP/DSP must provide how many hours of system
restoration training to field switching personnel - 🧠ANSWER ✔✔2 hours
Every 2 years GOP's with blackstart resources shall provide how many
hours of training to operating personnel responsible for startup -
🧠ANSWER ✔✔2 hours
COPYRIGHT©NINJANERD 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY 1
STATEMENT. ALL RIGHTS RESERVED
, BAL-002 default contingency reserve restoration period (following
disturbance recovery period) - 🧠ANSWER ✔✔90 minutes
How often should BA calculate and record inadvertent interchange -
🧠ANSWER ✔✔60 minutes/hourly
How often should BA provide MW-hour meter readings to adjacent BA's -
🧠ANSWER ✔✔60 minutes/hourly
TLR procedure (identifying TLR level and actions to be implemented)
needs updating how often - 🧠ANSWER ✔✔60 minutes/hourly
Hourly ATC for next 48 hours calculated how often - 🧠ANSWER ✔✔60
minutes/hourly
During EEA2/3 the energy deficient entity needs to update the RC how
often until alert is terminated - 🧠ANSWER ✔✔60 minutes/hourly
DOE-417 (disturbance reporting) should be completed by when -
🧠ANSWER ✔✔60 minutes
BA with loss of resources must submit RFI with start time no more than
how far beyond the resource loss - 🧠ANSWER ✔✔60 minutes