ACTUAL TEST COMPLETE REAL QUESTIONS AND
CORRECT VERIFIED ANSWERS (A NEW UPDATED
VERSION) |ALREADY GRADED A+ (BRAND NEW!!)
Using the Quantity Take-Off method for estimating, you begin
by estimating the cost of _________________ for each
individual task.
Answer- Labor and materials
Contractors must apply for permits through:
Answer- Their local building department
A cost effective method for managing material costs and
keeping inventory costs down is the:
Answer- JIT - Just in Time
,These are materials prohibited form open burning in Oregon
except for:
Answer- Unpainted and untreated scrap wood
An owner-seller may comply with the Homebuyers Protection
Act (HPA) by:
- Doing any of these
- Purchasing title insurance that does not exclude filed or unfiled
claims of lien,
- Obtaining lien waivers or releases
- Retaining at least 25% of the sales price in escrow
- Doing any of these
Answer- - Purchasing title insurance that does not exclude filed
or unfiled claims of lien,
- Obtaining lien waivers or releases
- Retaining at least 25% of the sales price in escrow
What are the possible consequences that a contractor may face if
he or she fails to provide the information to the Owner About
Construction Liens when required?
,- All of these are correct
- Contractor may be fined
- Contractor may lose lien rights
- Contractor may have CCB license suspended
- All of these are correct
Answer- - Contractor may be fined
- Contractor may lose lien rights
- Contractor may have CCB license suspended
Withheld taxes are considered to be "_____________" funds
that do not belong to the business and cannot be used for any
other purpose.
Answer- Trust
The major purpose of the building exterior shell is to:
Answer- Provide protection for the building at its exterior
boundaries and to enclose a suitable interior environment
, A project manager can be involved in more than one
construction project at the same time.
Answer- True
The building exterior shell may consist of:
- All of these are part of the building exterior shell
- Only windows and doors
- Only exterior wall assemblies
- Only roof assemblies
- All of these are part of the building exterior shell
Answer- - Only windows and doors
- Only exterior wall assemblies
- Only roof assemblies
Who is responsible for preparing the SDS?
Answer- The chemical manufacturer