With Correct Answers
What is the name of the National level ERP solution? c. LMP
To mitigate risks and collect user feedback, development and delivery efforts have been divided
into b. Waves
Online functional learning portals are accessed through the d. End User Manual - Plus
GCSS-Army will replace which of the following STAMIS systems? d. All of the Above
Where and when does NET Core Instructor-Facilitated Training (IFT) occur? b. On-site
classrooms during full fielding
GCSS-Army is specifically configured to c. Incorporate all of the business functions of
the current STAMIS into one integrated system
What will Wave 1 replace? b. Finance and SARSS
Which is an example of a historical challenge of STAMIS? d. All of the Above
How many master servers does GCSS-Army have? a. 1