When a tank that has been installed for less than 10 years is upgraded
with the cathodic protection, tightness test(s) are required as follows: -
✔✔✔ Correct Answer > Tightness tests should be conducted before the
installation of cathodic protection and 3-6 months after the installation
of the cathodic protection
A Class A operator shall maintain the records of UST site inspections for
a *minimum* of: - ✔✔✔ Correct Answer > 3 years
How should you dispose of used clean up materials? - ✔✔✔ Correct Answer >
Place them in a sealable bucket, then call your emergency response
contractor to dispose of them
New owners of an existing UST system shall register the UST system
with DEQ/LARA within what period from date of ownership? - ✔✔✔ Correct
Answer > 30 days
, UST systems with cathodic protection should be inspected for proper
operation by a qualified cathodic protection tester on the following
schedule: - ✔✔✔ Correct Answer > Every three years
UST systems with impressed current cathodic protection systems must
be inspected at a minimum: - ✔✔✔ Correct Answer > Every 60 days
Within what period after a repair should a cathodically protected UST
system be tested to ensure it is working properly? - ✔✔✔ Correct Answer > 6
months
Pressurized underground piping that routinely contains regulated
substances shall be monitored for releases in a manner that meets
what requirements? - ✔✔✔ Correct Answer > Be equipped with a line leak
detector, and have an annual line tightness test
A suspected release must be confirmed to the DEQ/LARA within: - ✔✔✔
Correct Answer > 7 days
What actions are required in MUSTR when there is a spill or overfil of
petroleum or hazardouz substances that result in a release into
groundwater, surface water, or substance soils? - ✔✔✔ Correct Answer > Notify
DEQ/LARA of a confirmed release, Immediately clean up the spill or
overfill, and Contain the spill