100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Sample questions from all CSLB trade exams QUESTIONS & ANSWERS ( A+ GRADED 100% VERIFIED)

Rating
-
Sold
-
Pages
23
Grade
A+
Uploaded on
22-01-2025
Written in
2024/2025

Sample questions from all CSLB trade exams QUESTIONS & ANSWERS ( A+ GRADED 100% VERIFIED)Sample questions from all CSLB trade exams QUESTIONS & ANSWERS ( A+ GRADED 100% VERIFIED) Sample questions from all CSLB trade exams QUESTIONS & ANSWERS ( A+ GRADED 100% VERIFIED) Sample questions from all CSLB trade exams QUESTIONS & ANSWERS ( A+ GRADED 100% VERIFIED) Sample questions from all CSLB trade exams QUESTIONS & ANSWERS ( A+ GRADED 100% VERIFIED) Sample questions from all CSLB trade exams QUESTIONS & ANSWERS ( A+ GRADED 100% VERIFIED)

Show more Read less
Institution
Cslb
Course
Cslb










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Cslb
Course
Cslb

Document information

Uploaded on
January 22, 2025
Number of pages
23
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • sample questions

Content preview

CSLB TRADE EXAMS WITH VERIFIED
QUESTIONS AND CORRECT ANSWERS




1. A boiler project costs $35400 for materials, $7500 for testing, and $12700 for
commissioning. What amount is due if the contractor has been paid for 45% of these
expenses already?

A. $25020
B. $30580
C. $48100
D. $55600
- ANSWERS-$30580

2. A chiller refrigerates which of the following?

A. Circulating air
B. Carbon dioxide
C. Circulating water
D. Nitrogen
- ANSWERS-Circulating water

3. A contractor determines that a particular job will take three workers an 8 hour day to
install 50 feet of retaining wall reinforcement. The labor cost is $43 per hour and the wall
is 300 feet long. What is the total labor cost for the job?

A. $1032
B. $2150
C. $6192
D. $12900
- ANSWERS-$6,192

4. A contractor is bidding on a job for a 30' high, 60' x 100' metal building. It will be
insulated with rigid board in both the ceiling and walls at a cost of $1.10/sq ft. How much
should be budgeted for insulation costs, assuming 5% waste?

, A. $11088
B. $13860
C. $17160
D. $18018
- ANSWERS-$18018

5. A contractor is bidding to install a walk-in cooler and finds that the compressor costs
$4600 and the piping is $5.76/foot for 200 feet of pipe. If this is 40% of the contract,
what is the contract's total bid price?

A. $5752
B. $9204
C. $10360
D. $14380
- ANSWERS-$14380

6. A contractor is excavating a pad that is 1500 square feet to a depth of 30 inches. The
cost of excavation is $10/cubic yard. What is the total estimated cost of the excavation?

A. $1250
B. $1388.89
C. $1666.67
D. $5000
- ANSWERS-$1388.89

7. A contractor is required to run 197 feet of EMT to the location of the sign. How many
pieces of EMT will be required?

A. 15
B. 19
C. 20
D. 25
- ANSWERS-20

8. A contractor needs 13 receptacles that cost $3.56 each plus sales tax of 7.25%. The
supplier states that for every 10 receptacles that are purchased, the contractor will get
one free of charge. What is the total cost of the receptacles?

A. $42.02
B. $42.72
C. $45.82

, D. $49.66
- ANSWERS-$45.82

9. A lite of glass, which is 42" x 62", has approximately how many square feet of glass?

A. 2604
B. 208
C. 104
D. 18
- ANSWERS-18

10. A packaged water source heat pump eliminates which of the following components?

A. Capacitor
B. Evaporation
C. Reversing valve
D. Air-cooled condenser
- ANSWERS-Air-cooled condenser

11. According dint the California Building Code, how is headroom clearance measured on a
standard stairway?

A. Vertically from the center of each tread
B. Vertically from a line connecting the nosing
C. From the bottom of and parallel to the first riser
D. Perpendicularly from a line connecting the nosings
- ANSWERS-Vertically from a line connecting the nosings

12. According to Cal/OSHA, the top handrail around scaffolding should be at what minimum
height?

A. 36"
B. 38"
C. 42"
D. 48"
- ANSWERS-42"

13. According to Caltrans Standard Specifications, what is the maximum distance allowed
between interior vertical members on a chain-link gate?

A. 2'
B. 4'
C. 6'
$10.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
Lectwiseman
5.0
(1)

Get to know the seller

Seller avatar
Lectwiseman Liberty University
View profile
Follow You need to be logged in order to follow users or courses
Sold
8
Member since
1 year
Number of followers
2
Documents
729
Last sold
2 weeks ago
LECT BOSTON

if in any need of a Test bank and Solution Manual, fell free to Message me All the best in your Studies

5.0

1 reviews

5
1
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions