100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
WGU C215 OA FINAL / WGU C215 OPERATION MANAGEMENT OA FINAL EXAM 2025 ACTUAL EXAM COMPLETE 250 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+ $26.99
Add to cart

Exam (elaborations)

WGU C215 OA FINAL / WGU C215 OPERATION MANAGEMENT OA FINAL EXAM 2025 ACTUAL EXAM COMPLETE 250 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+

 0 purchase
  • Course
  • WGU C215 OA
  • Institution
  • WGU C215 OA

WGU C215 OA FINAL / WGU C215 OPERATION MANAGEMENT OA FINAL EXAM 2025 ACTUAL EXAM COMPLETE 250 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+

Preview 4 out of 49  pages

  • January 21, 2025
  • 49
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • WGU C215 OA
  • WGU C215 OA
avatar-seller
johnkabiru
1|Page


WGU C215 OA FINAL / WGU C215 OPERATION
MANAGEMENT OA FINAL EXAM 2025 ACTUAL
EXAM COMPLETE 250 QUESTIONS AND
CORRECT DETAILED ANSWERS (VERIFIED
ANSWERS) |ALREADY GRADED A+


What is a major factor in the decision to locate a business near
its primary market territory? - ANSWER- Proximity to
Customers


A manufacturing company decides to open a new distribution
center location in order to minimize distribution costs to
warehouses or stores.What tool should the manufacturing
company use to determine where the new distribution center
should be located? - ANSWER- By using the center-of-gravity
approach


load-distance model - ANSWER- A procedure for evaluating
location alternatives based on distance.
break-even analysis - ANSWER- Technique used to compute the
amount of goods that must be sold just to cover costs.

,2|Page


Transportation method - ANSWER- Method that relies on a
specific algorithm to evaluate the cost impact of adding potential
location sites to the network of existing facilities.


Which two types of operations include repetitive processes? -
ANSWER- Continuous Process & Line Process


batch processes - ANSWER- A type of process used to produce
a small quantity of products in groups or batches based on
customer orders or specifications.
continuous processes - ANSWER- A type of process that
operates continually to produce a high volume of a fully
standardized product.


line processes - ANSWER- A type of process used to produce a
large volume of a standardized product.
project processes - ANSWER- A type of process used to make a
one-at-a-time product exactly to customer specifications.


A comprehensive automobile collision shop offers body and
engine repair as well as custom vehicle paint options.Which two
operational processes would suit this shop? - ANSWER- batch
process & project process

,3|Page




bottleneck - ANSWER- Longest task in the process.
process velocity - ANSWER- Ratio of throughput time to value-
added time
benchmarking - ANSWER- The process of studying the
practices of companies considered "best-in-class" and
comparing your company's performance against theirs.


Which formula would indicate that a fast-food restaurant was
performing at, above, or below its benchmark? - ANSWER-
actual output/standard output
In which organizational layout would one expect to see items
arranged by type? - ANSWER- process


group technology (GT) or cell layouts - ANSWER- Hybrid
layouts that create groups of products based on similar
processing requirements.
hybrid layouts - ANSWER- Layouts that combine characteristics
of process and product layouts.


process layouts - ANSWER- Layouts that group resources based
on similar processes or functions.

, 4|Page


product layouts - ANSWER- Layouts that arrange resources in
sequence to allow for an efficient buildup of the product.


A construction company produces furnished pre-fabricated
manufactured homes.


The production manager has discovered the following
challenges within one of the facilities:
• Production qualities are low and only a small number of
homes are built efficiently.
• The facility space allows for low handling of materials.
• There is limited space available for employees to operate


.Which hybrid layout should be used to address the company's
needs? - ANSWER- Group Technology
Group Technology (GT) - ANSWER- Brings the efficiencies of
a product layout to a process layout.
block plan - ANSWER- Schematic showing the placement of
resources in a facility.
Which instrument would use an allocation process for space
requirements in an industry scenario? - ANSWER- block plan

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller johnkabiru. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $26.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

43291 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 15 years now

Start selling
$26.99
  • (0)
Add to cart
Added