Air Methods Checkride Prep with Complete Solutions 2024/2025
Air Methods Checkride Prep with Complete Solutions 2024/2025 Per the AMC GOM what are the minimum ceiling and visibility requirements for SVFR? - answer-Day: 700' and 2 miles Night 800' and 3 miles What type of airspace is required in order to be granted a SVFR clearance? - answer-Controlled airspace, designated for an airport, to the surface Where is the IIMC procedure template to be kept? - answer-Posted in the base and kept in the helicopter When encountering deteriorating weather enroute, what options are available in accordance with the AMC GOM? - answer-Divert, Return to departure point, land and notify dispatch or execute IIMC procedure if other options are not available. What are the 4 initial steps for aircraft control when encountering IIMC? - answer-1. Attitude (level) 2. Heading (maintain unless avoiding known obstacles) 3. Power (adjust to climb power) 4. Airspeed (adjust to climb airspeed). When requesting IIMC assistance from ATC, what are the two requests that should be made and in what order? - answer-1. Request vectors to nearest VMC conditions. 2. Request vectors to closest approach. What steps are involved in the full IIMC procedure? - answer-1. Maintain aircraft control 2. climb to MSA
Written for
- Institution
- Air Methods
- Course
- Air Methods
Document information
- Uploaded on
- January 20, 2025
- Number of pages
- 8
- Written in
- 2024/2025
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
air methods checkride prep with complete solutions
Also available in package deal