Certified Healthcare Constructor Exam 3 VERSIONS Questions 2024/2025 Questions With Verified Answers From Experts When a fire alarm will be out of service for four more hours in a 24 hour. What is required? - ANSWER-The facility must either evacuate the building or notify the fire department and initiate firewatch When a sprinkler system will be out of service for ten or more hours in a 24 hour. What is required? - ANSWER-The facility must either evacuate the building or notify the fire department and initiate firewatch What is required when using smoke barriers to divide areas of the hospital into smoke departments - ANSWER-has a fire rating for new one hour rated for existing half an hour rated walls are required to go to the deck above doors are not required to latch, but our self closing in 20 minute rated or equivalent penetrations are required to be stopped. Smoke dampers are required for ductwork penetrations with exceptions, not required if HVAC is fully ducted existing not required if HVAC is fully ducted and sprinkler What is required when using fire barriers? - ANSWER-has a fire rating between half an hour and three hours walls are required to go to deck above doors are required to latch and our self closing rating is defined by NFPA 101-2012 table 8.3.4.2 generally three-quarter of wall rating penetrations are required to be stopped. Fire dampers required in ductwork penetrations only if rated two hours or more air transfer openings are required to have dampers. What three things should be done before starting the project - ANSWER-project risk assessment, risk, mitigation planning, and mitigating project risk What is a project risk assessment? - ANSWER-Project risk may include health, financial procurement, legal and regulatory risk and more scope Creek high cost, and Time crunches. Can all Dale project if they are not adequately managed although a risk assessment process cannot prevent risk from occurring they can help to minimize the impact. The door in a two hour fire barrier is required to have a rating of? - ANSWER-1 1/2 hour which of the following distinguishes a capital expense from an operational expense? - ANSWER-Cost in life expectancy

Show more Read less
Institution
Certified Healthcare Constructor
Course
Certified Healthcare Constructor











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Certified Healthcare Constructor
Course
Certified Healthcare Constructor

Document information

Uploaded on
December 30, 2024
Number of pages
69
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Certified Healthcare Constructor Exam 3 VERSIONS
Questions 2024/2025 Questions With Verified Answers
From Experts

When a fire alarm will be out of service for four more hours in a 24 hour. What is
required? - ANSWER-The facility must either evacuate the building or notify the
fire department and initiate firewatch


When a sprinkler system will be out of service for ten or more hours in a 24 hour.
What is required? - ANSWER-The facility must either evacuate the building or
notify the fire department and initiate firewatch


What is required when using smoke barriers to divide areas of the hospital into
smoke departments - ANSWER-has a fire rating for new one hour rated for
existing half an hour rated walls are required to go to the deck above doors are
not required to latch, but our self closing in 20 minute rated or equivalent
penetrations are required to be stopped. Smoke dampers are required for
ductwork penetrations with exceptions, not required if HVAC is fully ducted
existing not required if HVAC is fully ducted and sprinkler


What is required when using fire barriers? - ANSWER-has a fire rating between
half an hour and three hours walls are required to go to deck above doors are
required to latch and our self closing rating is defined by NFPA 101-2012 table
8.3.4.2 generally three-quarter of wall rating penetrations are required to be

,stopped. Fire dampers required in ductwork penetrations only if rated two hours
or more air transfer openings are required to have dampers.


What three things should be done before starting the project - ANSWER-project
risk assessment, risk, mitigation planning, and mitigating project risk


What is a project risk assessment? - ANSWER-Project risk may include health,
financial procurement, legal and regulatory risk and more scope Creek high cost,
and Time crunches. Can all Dale project if they are not adequately managed
although a risk assessment process cannot prevent risk from occurring they can
help to minimize the impact.


The door in a two hour fire barrier is required to have a rating of? - ANSWER-1 1/2
hour


which of the following distinguishes a capital expense from an operational
expense? - ANSWER-Cost in life expectancy


ventilation in an operating room typically has? - ANSWER-Hi air changes per hour
and positive pressure to surrounding areas


while working on a hospital project, you witnessed an underground oil tank that
has been ruptured during excavation. What is your best course of action after

,ensuring the immediate safety of those in the area? - ANSWER-Notify the
contractor safety officer, and then the hospital safety officer


which of the following types of facilities must maintain operation 24 hours a day?
- ANSWER-Critical access hospital


A renovation project includes replacing casework in a hospital pharmacy. The
pharmacy cannot be relocated while the work is taking place which one of the
following would be best measures to implement? - ANSWER-Use temporary
containment create negative pressure with Eric. Exhausted outside the pharmacy
and perform work when the pharmacist is present.


you're developing plans to renovate an existing nursing unit. The project will last
approximately three months and we require that the automatic fire alarm system
be removed and replaced which approach best meets ILSM requirements? -
ANSWER-Install a temporary fire detection system system tested monthly and
document testing


which of the following is not part of the means of egress? - ANSWER-A fire rated
elevator


in existing hospital is going to gut and rebuild the entire fourth floor which houses
two medical surgical nursing units it is roughly 150' x 400' how many smoke
compartments are required on this floor to ensure compliance to NFPA 101- 2012?

, - ANSWER-three. NFPA 101 2012 states that the maximum size of a smoke
compartment is 22,500 ft.². so you would multiply 150' by 400' which equals
60,000 ft.² then 60,000÷22,500 = 2.6 (two will not be enough must have three)


when planning the installation of a new access control system for the ICU, which
of the following would be the most important to address? - ANSWER-Required exit
doors can be open at all times in the direction of egress


which of the following are elements of a capital budget? - ANSWER-New MRI
expansion of the physical therapy department and replacement of a chiller


A university teaching hospital is planning a renovation of PACU when preparing a
phasing plan which is most important to plan around the ratio to PACU beds? -
ANSWER-Operating rooms


based on the following information, which building has the highest priority for
replacement?
buildings acute care hospital 40 years 30000,000 deferred maintenance cost 100
million replacement cost children's Hospital 25 years 25 million deferred
maintenance cost 60 million replacement cost MLB 30 years 700,000
maintenance cost 7 million replacement cost behavioral health hospital 10 years 4
million deferred maintenance cost 30 million replacement cost - ANSWER-
Children's Hospital (you use the FCI formula some of deficiencies or necessary
repairs divided by current replacement value equals FCI)
$27.89
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
profadrian

Get to know the seller

Seller avatar
profadrian Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
0
Member since
1 year
Number of followers
0
Documents
26
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions