100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

ICC CALIFORNIA UST SERVICE TECHNICIAN EXAM NEWEST 2025 ACTUAL EXAM 300 QUESTIONS AND CORECT DETAILED ANSWERS (VERIFIED ANSWERS)A GRADE

Rating
5.0
(1)
Sold
-
Pages
35
Grade
A+
Uploaded on
26-12-2024
Written in
2024/2025

ICC CALIFORNIA UST SERVICE TECHNICIAN EXAM NEWEST 2025 ACTUAL EXAM 300 QUESTIONS AND CORECT DETAILED ANSWERS (VERIFIED ANSWERS)A GRADE

Institution
ICC CALIFORNIA UST SERVICE
Course
ICC CALIFORNIA UST SERVICE











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ICC CALIFORNIA UST SERVICE
Course
ICC CALIFORNIA UST SERVICE

Document information

Uploaded on
December 26, 2024
Number of pages
35
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ICC CALIFORNIA UST SERVICE TECHNICIAN EXAM NEWEST 2025
ACTUAL EXAM 300 QUESTIONS AND CORECT DETAILED
ANSWERS (VERIFIED ANSWERS)A GRADE
1. UDC was required at time of installation for all sys- January 1, 2000
tems installed after?

2. July 1, 2005, service techs shall possess or work ICC UST Service
under someone who has a current certification indi- Technician Exam
cating he or she has passed the?

3. ICC cert must be renewed every? 24 months

4. Service techs must possess or be employed by a The individual has
person who has the appropriate contractor's license a tank testing li-
unless? cense

5. Service tech is defined by any individual who? Tests UST moni-
toring equipment,
trouble shoots
UST systems,
and/or installs
UST monitoring
equipment.

6. If the manufacturer training no longer exist, the local Approve compara-
agency may? ble alternate train-
ing .

7. UST includes? Tank and connect-
ed piping

8. What is considered a UST? A petroleum stor-
age tank.

9. What UST system meets the requirements for sec-
ondary containment? 11. Considered
"pipe" on
10. According to title 23; the following piping compo- tanks
nents if installed after July 1, 1987 must have sec- installed
ondary containment. after July 1,
2003.


,ICC CALIFORNIA UST SERVICE TECHNICIAN EXAM NEWEST 2025
ACTUAL EXAM 300 QUESTIONS AND CORECT DETAILED
ANSWERS (VERIFIED ANSWERS)A GRADE
Doubled wall tanks

Pressured product piping


Pressured product piping and below






,ICC CALIFORNIA UST SERVICE TECHNICIAN EXAM NEWEST 2025
ACTUAL EXAM 300 QUESTIONS AND CORECT DETAILED
ANSWERS (VERIFIED ANSWERS)A GRADE
ground vapor re-
covery.

12. Under dispenser containment (UDC) was required for December 31,
all existing UST systems by 2003

13. System for exchanging gas vapors in a storage tank Stage 1 vapor re-
and product in a fuel delivery truck covery

14. An approved method for non-visual monitoring for Statistical Invento-
existing UST systems. ry Reconciliation
(SIR)

15. ATG must be capable for detecting a release of? 0.2 gallons per
hour

16. What is no longer an approved method for non-visual Manual inventory
monitoring on existing UST systems? reconciliation.

17. Automatic line leak detectors installed on under- 3 gallons per hour
ground piping with secondary containment shall be at 10 psi
capable of detecting a leak of ?

18. How often should ATG be programmed to test the At least monthly
tank?

19. According to PEI RP 300, a combustible gas can be Detect vapor leaks
used to? in a vapor recov-
ery system.

20. According to PEI RP 300, a written scope of work for Construction
vapor recovery installation should include? plans

21. Positive shut off overfill protection device must stop 95% full
the flow of fuel when the tank is no more then?

22. According to Executive Order (EO) VR 201-A , what Depended filter
could cause a nozzle shut off mechanism or malfunc- seal damage
tion?


, ICC CALIFORNIA UST SERVICE TECHNICIAN EXAM NEWEST 2025
ACTUAL EXAM 300 QUESTIONS AND CORECT DETAILED
ANSWERS (VERIFIED ANSWERS)A GRADE
23. According to VR 201-A, breakaway reconnection Logged in GDF
must be? log

24. According to PEI RP 300 what is an INCORRECT Sketching a dia-
method of documenting piping location? gram on the inside
cover of vapor re-
covery equipment
manual

25. According to PEI RP 300 as built drawing or pictures maintained as
of the underground pipping and other components long as UST is in
shall be . service.

26. According to EO VR 101-E maintenance records are Name and Desig-
required to include what? nated UST Opera-
tor.

27. The Phil-Tite EVR Phase 1 system require that vapor Used with no more
vent pipes at any UST system be than 3 p/v valves

28. According to EO VR 2010 after installing a new spout Nozzle dispensing
assembly in the Healy 900 nozzle the following test shut off test
must be conducted?

29. According to Healy EO VR 201-A a vapor recovery Gasoline dispens-
record is to be maintained by? ing facility opera-
tor(GDF)

30. An enhanced leak detection test is required within 1000 feet
how many feet of a public drinking well?

31. What are the components of the Fire Triangle? Fuel, Heat/Ignition
Source, Oxygen

32. If equipped with an over fill alarm, it must be located? So it can be seen
or heard from the
delivery location.

Reviews from verified buyers

Showing all reviews
1 year ago

5.0

1 reviews

5
1
4
0
3
0
2
0
1
0
Trustworthy reviews on Stuvia

All reviews are made by real Stuvia users after verified purchases.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
mingyong Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
47
Member since
1 year
Number of followers
0
Documents
415
Last sold
2 days ago
proflean

I specialize in providing high-quality documents containing expertly crafted questions and answers tailored to a variety of subjects and disciplines. Whether you\\\'re preparing for exams, completing assignments, or simply expanding your knowledge, my materials are designed to meet your academic and professional needs. Why Choose My Materials? Accurate Content: All answers are thoroughly researched and verified for correctness. User-Friendly Format: Organized for easy navigation and understanding. Wide Coverage: Suitable for students, professionals, and researchers across diverse fields. Affordable Pricing: High-quality materials at pocket-friendly rates. Timely Updates: Regularly updated to ensure relevance and alignment with current syllabi. My Commitment to You I am dedicated to supporting your academic success by delivering resources that simplify learning and make studying more efficient.

Read more Read less
4.4

309 reviews

5
161
4
114
3
29
2
3
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions