EXAM NEWEST 2024 ACTUAL EXAM 300
QUESTIONS AND CORECT DETAILED ANSWERS
(VERIFIED ANSWERS)
Leave the first rating
Terms in this set (390)
Which agency approves a.) The Regional Water Quality Board
a site-specific variance CCR Title 23, Sec 2681(a)
which allows for an
alternative method of
construction or
monitoring:
a.) The Regional Water
Quality Board
b.) The State Water
Resources Control Board
c.) The Department of
Toxic Substance Control
d.) The local agency
,The regulations to b.) California Code of Regulations; Title 23, Chapter
enforce compliance of 16
underground storage
tank systems in the state
are found in?
a.) Code of Federal
Regulations, 40 CFR Part
281
b.) California Code of
Regulations, Title 23,
Chapter 16
c.) Code of Federal
Regulations, 40 CFR Part
280
d.) California Code of
Regulations, Title 23,
Chapter 17
By definition an b.) The tank, all connected piping, ancillary
"underground storage equipment and containment system
tank system" includes
a.) The tank, all (H&SC, Sec 25281(z))
connected piping and
dispensers
b.) The tank, all
connected piping,
ancillary equipment and
containment system
c.) Only the tank
d.) Only tanks totally
beneath the surface of
the ground
,The written report b.) Cause of the release
submitted to the local CCR Title 23, Sec 2652(c)
agency after an
unauthorized release is
required to include the
following except:
a.) Description of actions
taken to stop the release
b.) Cause of the release
c.) Method of disposal of
released product
d.) Date on which the
release was discovered
An unauthorized release D. All of the above
which does not escape H&SC, Sec 25294
from secondary
containment only
requires a record on the
operator's monitoring
reports provided:
A. It did not increase the
hazard of fire
B. It did not cause any
deterioration of the
secondary containment
C. It was cleaned up
within 8 hours of
detection
D. All of the above
, The annual monitoring D. A person who meets the requirements of both a
certification may be and b
performed by: CCR Title 23, Sec 2715(i)
A. A person possessing
the appropriate
contractors licenses
B. An individual trained
and certified by the
manufacturer of the
monitoring equipment
C. A designated UST
operator
D. A person who meets
the requirements of both
a and b
When an automatic tank c.) Outside air temperature
gauge is utilized for CCR Title 23, Sec 2643(b)(1)
single-walled tank leak
detection, it shall
generate a post-test hard
copy data report of the
following information,
except:
a.) Liquid volume
b.) Fuel depth
c.) Outside air
temperature
d.) Time and date of test
If a UST system is utilizing c.) 90%
an overfill alarm, the
alarm must be triggered
to alert the transfer
operator when the tank is
no more than ___________ full
a.) 85%
b.) 95%
c.) 90%
d.) 80%