According to plans and specifications, on time, within a defined budget and
a safe work environment.
Give this one a try later!
The ____________________ is workmanship
Partnering relationships are based
1 2 oriented, and where workmanship
upon:
standards are established.
Construction Quality Management
is the performance of tasks, which During the punch-out inspection of
4
ensure that construction is a project:
performed.
Don't know?
https://quizlet.com/973399365/cqm-c-2024-2025-latest-update-comprehensive-questions-frequently-most-tested-and-verifeid-answers-100-accura… 1/6
, 11/19/24, 6:57 AM CQM-C | 2024-2025 LATEST UPDATE COMPREHENSIVE QUESTIONS (Frequently Most Tested) AND VERIFEID ANSWER…
Terms in this set (40)
Achieve the quality established by properly
The purpose of
developed requirements through the combined
Construction Quality
responsibility, but seperate efforts of contractpr
Management is to:
smd government personnel.
Construction Quality According to plans and specifications, on time,
Management is the within a defined budget and a safe work
performance of tasks, environment.
which ensure that
construction is
performed.
Partnering relationships Building trust and dedication to common goals
are based upon:
It is the responsibility of Periodically verify that the contractors system of
Quality Assurance control is working effectively.
Personnel to:
An effective contractor Be an incentive for work to be done correctly the
quality control program first time resulting in earlier completion, reduced
will: field overhead costs, and greater profits.
The success or failure of The ability to control costs, finance work, estimate
all contractors is based jobs, schedule the work, and maintain effective
upon: quality control.
Quality Assurance Require contractors to maintain the quality specified
Personnel have the in the plans and specifications.
responsibility to:
The process by which ongoing and completed work
Inspection is:
is examined
Quality Assurance Personnel must assure that the
During the punch-out
contractor prepares a punch-list and makes
inspection of a project:
corrections.
If there is a disagreement The government makes the final determination
whether the contractors
work complies with the
contract: