Examination
180 minutes
Instructions:
1. Read each question carefully.
2. Answer all questions.
3. Use the provided answer sheet to mark your responses.
4. Ensure all answers are final before submitting the exam.
5. Please answer each question below and click Submit when you have completed
the Exam.
6. This test has a time limit, The test will save and submit automatically when the
time expires
7. This is Exam which will assess your knowledge on the course Learning
Resources.
Good Luck!
, For Inquiries about This or Any Other Exam HMU
NCEES National Council of Examiners for Engineering and
Surveying 2024-2025
DAU Fundamentals of Engineering FE Exam 3 Facility
Engineering Life Cycle Support Review Questions with Verified
Solutions | 100% Pass Guaranteed | Graded A+ |
Read All Instructions Carefully and Answer All the
Questions Correctly Good Luck: -
Masterformat provides a standard structure for
organizing construction standards. How many primary
divisions are part of the Masterformat? - Answer>> -
NOT- 51
Task orders are used for which of the below kinds of
work? - Answer>> Non-complex construction and
maintenance and repair
The Master Planner wants to award a contract to
support the installation's master planning efforts. Based
on FAR Part 36.601-4(a), would this effort be
accomplished through an architect-engineer contract? -
Answer>> Yes
The Installation Commander is asking questions about
military construction, operations and maintenance, and
military family housing projects planned for the
installation. Which component of the Comprehensive
Plan would you go to a detail of the physical location of
projects that have been approved or programmed for
funding throughout the installation? - Answer>> -NOT-
Land Use Plan
As the Design Manager preparing the government
estimate for a design project. When considering profit,
Need Writing Help? We've Got You Covered! ✍️
100%
NO AI or Plagiarism Usage Guaranteed🎯
💬 Chat with us here: 📧
, For Inquiries about This or Any Other Exam HMU
which if the following in NOT true? - Answer>> -NOT-
Profit should consider the nature of the work to be
performed
FAR Part 22.406-7 - Compliance Checking requires
interviews of laborers to check work classification, rates
of pay, fringe benefits payment, and hours worked.
How often is the Government required to conduct these
interviews? - Answer>> Agency's policy
All project planning projects include the same five
steps. Which of the following shows the five steps in
their logical progression? - Answer>> Develop
requirements; evaluate assets; analysis, concepts, and
proposals; initiate action; feedback and quality
assurance
Which of the following may be required if Government
Furnished Equipment (GFE) is not supplied to the
contractor in accordance with the time specified in the
contract? - Answer>> An adjustment in price or
delivery schedule in the contract
The Base Operations Support contractor in performing
preventative maintenance on the HVAC in the
headquarters building. At the same time, they are
responding to a service call to repair one of the toilets
in the building. This work would be defined as: -
Answer>> Sustainment
You are the installation Environmental Division Chief.
There are residential structures on the installation
where lead-based paint has been used that have been
identified for disposal. Which of the following
environmental requirements best describes the