NICET Sample Exam 2024
NICET Sample Exam 2024 Secondary power for remote supervising station systems shall be capable of normal operation for ___ hours and then operate the system in alarm for ___ minutes? - answer-24 / 5 A fire alarm system which serves contiguous or noncontiguous properties under one ownership is considered? - answer-Proprietary system An initiating device which is destroyed as a result of operation is what type? - answer-Nonrestorable The delay from the operation of an initiation device to the automatic activation of a fire safety function shall not exceed? - answer-10 seconds What documentation shall be delivered upon final acceptance of the system? - answer-Owners manual and installation instructions, Record copy of site specific software, Record drawings What does an asterisk (*) designate in NFPA 72? - answer-Explanatory information follows in Annex A What NFPA standard covers smoke detector requirements for HVAC units? - answer-NFPA 90A Equipment constructed and installed in conformity with NFPA 72 shall be? - answer-Listed Whom may serve as a AHJ? - answer-Fire Marshal, Insurance Inspector, Building Owner
Written for
- Institution
- Nicet
- Course
- Nicet
Document information
- Uploaded on
- November 2, 2024
- Number of pages
- 6
- Written in
- 2024/2025
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Also available in package deal