DBIA: Principles of Design-Build and Post Award & Contracts, Project Delivery Exam Questions and Answers Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing Design-Build. What Year? - ANSWER-Clinger Cohen Act/Defense Procurement Reform Act 1996 The level of quality that any average Design Professional would be able to perform given the circumstances. - ANSWER-Standard of Care Fastest Project Delivery method, fast tracking possible overlapping design with construction utilizing incremental packages. - ANSWER-Design Build Procurement Method - Common for A/E - ANSWER-Negotiated (Qualifications Based) Contract Format - Combines Cost-Plus & Lump-Sum, contractor reimbursed for actual cost plus a fee only up to a certain amount. - ANSWER-GMP (Guaranteed Maximum Price) Contract Format - cost per piece - ANSWER-Unit Price Successful Design Build requires _____ & _______ between participants - ANSWER-Trust, Flexibility ©EMILLECT 2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED FIRST PUBLISH OCTOBER 2024 Page 2/18 Singular responsibility for both design & construction was first made into a building code by ____ - ANSWER-Hammurabi Owner provided items such as 20% design or more and provides prescriptive specs at RFP. - ANSWER-Bridging Documents Single point of responsibility for both design & construction is an attribute of what delivery method? - ANSWER-Design Build The process of checking milestones along the way for completeness. - ANSWER-Substantiation Owner requiring specific products or methods be instituted by DB team in order to achieve desired performance. - ANSWER-Prescriptive T/F Detailed estimating is the Building systems approach to estimating - ANSWER-False T/F feasibility estimate is cost model and establishes budget for project - ANSWER-False T/F key element of quality assurance is keeping communication lines open between owner and DB - ANSWER-True T/F in Design/cost relationship of DB, the constructor establishes design parameters for architect - ANSWER-True T/F trust is most important thing for DB - ANSWER-False ©EMILLECT 2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED FIRST PUBLISH OCTOBER 2024 Page 3/18 DB estimating sequence where 15%-20% of design is completed - ANSWER-Schematic estimating Provides baseline budgets and schedules and list estimate trends - ANSWER-Trend logs What is NOT a design managers role? - ANSWER-Coordinating owner design reviews and approvals Who is responsible for ensuring quality assurance? - ANSWER-Design Build Team Awarded to proposer with highest combined total points of technical and price proposals - ANSWER- Weighted criteria Estimate provided with very little design - ANSWER-Conceptual estimating Maintains control of budget and design process between major estimate phases - ANSWER-Trend estimating Owner proforma based on sq ft or ROM estimates - ANSWER-Feasibility

Show more Read less
Institution
DBIA
Course
DBIA










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
DBIA
Course
DBIA

Document information

Uploaded on
October 30, 2024
Number of pages
18
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

©EMILLECT 2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED

FIRST PUBLISH OCTOBER 2024




DBIA: Principles of Design-Build and Post

Award & Contracts, Project Delivery Exam

Questions and Answers


Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing

Design-Build. What Year? - ANSWER✔✔-Clinger Cohen Act/Defense Procurement Reform Act 1996


The level of quality that any average Design Professional would be able to perform given the

circumstances. - ANSWER✔✔-Standard of Care


Fastest Project Delivery method, fast tracking possible overlapping design with construction utilizing

incremental packages. - ANSWER✔✔-Design Build


Procurement Method - Common for A/E - ANSWER✔✔-Negotiated (Qualifications Based)


Contract Format - Combines Cost-Plus & Lump-Sum, contractor reimbursed for actual cost plus a fee only

up to a certain amount. - ANSWER✔✔-GMP (Guaranteed Maximum Price)


Contract Format - cost per piece - ANSWER✔✔-Unit Price


Successful Design Build requires _____ & _______ between participants - ANSWER✔✔-Trust, Flexibility


Page 1/18

, ©EMILLECT 2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED

FIRST PUBLISH OCTOBER 2024




Singular responsibility for both design & construction was first made into a building code by ____ -

ANSWER✔✔-Hammurabi


Owner provided items such as 20% design or more and provides prescriptive specs at RFP. -

ANSWER✔✔-Bridging Documents


Single point of responsibility for both design & construction is an attribute of what delivery method? -

ANSWER✔✔-Design Build


The process of checking milestones along the way for completeness. - ANSWER✔✔-Substantiation


Owner requiring specific products or methods be instituted by DB team in order to achieve desired

performance. - ANSWER✔✔-Prescriptive


T/F Detailed estimating is the Building systems approach to estimating - ANSWER✔✔-False


T/F feasibility estimate is cost model and establishes budget for project - ANSWER✔✔-False


T/F key element of quality assurance is keeping communication lines open between owner and DB -

ANSWER✔✔-True


T/F in Design/cost relationship of DB, the constructor establishes design parameters for architect -

ANSWER✔✔-True


T/F trust is most important thing for DB - ANSWER✔✔-False


Page 2/18

, ©EMILLECT 2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED

FIRST PUBLISH OCTOBER 2024




DB estimating sequence where 15%-20% of design is completed - ANSWER✔✔-Schematic estimating


Provides baseline budgets and schedules and list estimate trends - ANSWER✔✔-Trend logs


What is NOT a design managers role? - ANSWER✔✔-Coordinating owner design reviews and approvals


Who is responsible for ensuring quality assurance? - ANSWER✔✔-Design Build Team


Awarded to proposer with highest combined total points of technical and price proposals - ANSWER✔✔-

Weighted criteria


Estimate provided with very little design - ANSWER✔✔-Conceptual estimating


Maintains control of budget and design process between major estimate phases - ANSWER✔✔-Trend

estimating


Owner proforma based on sq ft or ROM estimates - ANSWER✔✔-Feasibility estimate


Determines if proposer is qualified for project with yes or no statement - ANSWER✔✔-Statement of

qualifications


Contract for Design-Build Consultant Services - ANSWER✔✔-DBIA 501


Standard Form of Preliminary Agreement Between Owner and Design-Builder - ANSWER✔✔-DBIA 520


Standard Form of Agreement Between Owner & Design-Builder for a Lump Sum - ANSWER✔✔-DBIA 525


Page 3/18

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Emillect West Virginia University
View profile
Follow You need to be logged in order to follow users or courses
Sold
28
Member since
1 year
Number of followers
2
Documents
3004
Last sold
2 months ago
GOLDEN ORCHIDS STORE.

On this page, you find all documents, package deals, and flashcards offered by seller Emillect.

3.0

4 reviews

5
1
4
0
3
2
2
0
1
1

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions