FIRST PUBLISH OCTOBER 2024
DBIA: Principles of Design-Build and Post
Award & Contracts Exam Questions and
Answers
Federal Government passed bond requiring payment and performance bonds on all public works, what
year? - ANSWER✔✔-Miller Act 1935
Bill directing A/E's selected on qualifications, what year? - ANSWER✔✔-Brooks Bill 1972
Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing
Design-Build. - ANSWER✔✔-Clinger Cohen Act/Defense Procurement Reform Act 1996
The level of quality that any average Design Professional would be able to perform given the
circumstances. - ANSWER✔✔-Standard of Care
Slowest Project Delivery method, linear in nature, prescriptive (owner knows what they want), -
ANSWER✔✔-Design Bid Build
Project Delivery - Many contracts through Owner - ANSWER✔✔-Multi Prime
Page 1/14
, ©EMILLECT 2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED
FIRST PUBLISH OCTOBER 2024
Project Delivery method allowing the contractor to come on board very early in design for
preconstruction services yet maintains separation between Designer and Builder contractually. -
ANSWER✔✔-CM at Risk
Fastest Project Delivery method, fast tracking possible overlapping design with construction utilizing
incremental packages. - ANSWER✔✔-Design Build
Procurement Method - Most Familiar - ANSWER✔✔-Low Bid
Procurement Method - Common for A/E - ANSWER✔✔-Negotiated (Qualifications Based)
Procurement Method - Qualifications and Price - ANSWER✔✔-Best Value
Procurement Method - Direct - ANSWER✔✔-Sole Source
Contract Format w/ agreed upon fixed price - ANSWER✔✔-Lump Sum
Contract Format - contractor reimbursed for actual cost plus an agreed upon percentage - ANSWER✔✔-
Cost Plus Fee
Contract Format - Combines Cost-Plus & Lump-Sum, contractor reimbursed for actual cost plus a fee only
up to a certain amount. - ANSWER✔✔-GMP (Guaranteed Maximum Price)
Contract Format - cost per piece - ANSWER✔✔-Unit Price