DBIA: Principles of Design-Build and Post Award & Contracts Exam Questions and Answers Federal Government passed bond requiring payment and performance bonds on all public works, what year? - ANSWER-Miller Act 1935 Bill directing A/E's selected on qualifications, what year? - ANSWER-Brooks Bill 1972 Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing Design-Build. - ANSWER-Clinger Cohen Act/Defense Procurement Reform Act 1996 The level of quality that any average Design Professional would be able to perform given the circumstances. - ANSWER-Standard of Care Slowest Project Delivery method, linear in nature, prescriptive (owner knows what they want), - ANSWER-Design Bid Build Project Delivery - Many contracts through Owner - ANSWER-Multi Prime ©EMILLECT 2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED FIRST PUBLISH OCTOBER 2024 Page 2/14 Project Delivery method allowing the contractor to come on board very early in design for preconstruction services yet maintains separation between Designer and Builder contractually. - ANSWER-CM at Risk Fastest Project Delivery method, fast tracking possible overlapping design with construction utilizing incremental packages. - ANSWER-Design Build Procurement Method - Most Familiar - ANSWER-Low Bid Procurement Method - Common for A/E - ANSWER-Negotiated (Qualifications Based) Procurement Method - Qualifications and Price - ANSWER-Best Value Procurement Method - Direct - ANSWER-Sole Source Contract Format w/ agreed upon fixed price - ANSWER-Lump Sum Contract Format - contractor reimbursed for actual cost plus an agreed upon percentage - ANSWER- Cost Plus Fee Contract Format - Combines Cost-Plus & Lump-Sum, contractor reimbursed for actual cost plus a fee only up to a certain amount. - ANSWER-GMP (Guaranteed Maximum Price) Contract Format - cost per piece - ANSWER-Unit Price ©EMILLECT 2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED FIRST PUBLISH OCTOBER 2024 Page 3/14 Contract Format - established cost/benchmark determined jointly by project team. - ANSWER-Target Price Successful Design Build requires _____ & _______ between participants - ANSWER-Trust, Flexibility Singular responsibility for both design & construction was first codified by ____ - ANSWER- Hammurabi Owner provided items such as 20% design or more and provides prescriptive specs at RFP. - ANSWER-Bridging Documents Owner is responsible for implied warranties in the sufficiency of the specifications. - ANSWER- Spearin Doctrine ____ ____ should identify end results. - ANSWER-Performance Requirements Single point of responsibility for both design & construction is an attribute of what delivery method? - ANSWER-Design Build The process of checking milestones along the way for completeness. - ANSWER-Substantiation Owner requiring specific products or methods be instituted by DB team in order to achieve desired performance. - ANSWER-Prescriptive T/F Detailed estimating is the Building systems approach to estimating - ANSWER-False ©EMILLECT 2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED FIRST PUBLISH OCTOBER 2024 Page 4/14 T/F feasibility estimate is cost model and establishes budget for project - ANSWER-False T/F key element of quality assurance is keeping communication lines open between owner and DB - ANSWER-True T/F in Design/cost relationship of DB, the constructor establishes design parameters for architect - ANSWER-True T/F trust is most important thing for DB - ANSWER-False DB estimating sequence where 15%-20% of design is completed - ANSWER-Schematic estimating Provides baseline budgets and schedules and list estimate trends - ANSWER-Trend logs Drawings and specs are approved by DOR and confirmed within budget - ANSWER-Committed Design What is NOT a design managers role? - ANSWER-Coordinating owner design reviews and approvals Who is responsible for ensuring quality assurance? - ANSWER-Design Build Team When programming and design is developed by DB entity - ANSWER-Direct DB Establishes that under DBB, owner is responsible for increased cost due to defective plans/specs - ANSWER-Spearin Doctrine ©EMILLECT 2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED FIRST PUBLISH OCTOBER 2024 Page 5/14 Selection where qualitative aspects are scored out of 100 the divided by qualitative score - ANSWER- Adjusted low bid Owner defines performance data but DB Entity provides design solution - ANSWER-Design criteria DB Awarded to proposer with highest combined total points of technical and price proposals - ANSWER- Weighted criteria Estimate provided with very little design - ANSWER-Conceptual estimating Maintains control of budget and design process between major estimate phases - ANSWER-Trend estimating Owner proforma based on sq ft or ROM estimates - ANSWER-Feasibility estimate Determines if proposer is qualified for project with yes or no statement - ANSWER-Statement of qualifications Contract for Design-Build Consultant Services - ANSWER-DBIA 501 Standard Form of Preliminary Agreement Between Owner and Design-Builder - ANSWER-DBIA 520 Standard Form of Agreement Between Owner & Design-Builder for a Lump Sum - ANSWER-DBIA 525 ©EMILLECT 2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED FIRST PUBLISH OCTOBER 2024 Page 6/14 Standard Form of Agreement Between Owner & Design-Builder, Cost Plus Fee with an Option for a Guaranteed Maximum Price - ANSWER-DBIA 530 Standard Form of General Conditions of Contract Between Owner & Design-Builder - ANSWER-DBIA 535 Standard Form of Agreement Between Design-Builder & Design Consultant, - ANSWER-DBIA 540 Standard Form of Agreement Between Design-Builder & General Contractor, Cost Plus Fee with or without a Guaranteed Maximum Price - ANSWER-DBIA 550 Standard Form of Teaming Agreement Between Design-Builder & Teaming Party - ANSWER-DBIA 580 The term used to describe the situation where the designers and contractors are placed in close proximity to one another, often in the same office or jobsite trailer. - ANSWER-Co-location The process of managing the design to a set of pre-determined "targets" - ANSWER-Design Reconciliation Technology to assess design value. - ANSWER-ADePT Document the describes the procurement process, forms the basis for final proposals an becomes an element of the contract. - ANSWER-Request for Proposals ©EMILLECT 2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED FIRST PUBLISH OCTOBER 2024 Page 7/14 Three documents that initially govern the DB agreement in the best value competition. - ANSWER- RFP, Technical Proposal, Price Proposal The party holding the prime contract position in a multiple firm DB contractual relationship. - ANSWER-Controlling Party Design Build RFP's will be evaluated off of less than what percentage for qualifications based evaluation. - ANSWER-35% What the DB'er now has the right to do after award of contract. - ANSWER-Negotiate A stated amount sometimes paid to unsuccessful proposers in consideration of preparing a Design-Build Proposal. - ANSWER-Honorarium The owner warrants the sufficiency of the plans and specs to th

Show more Read less
Institution
DBIA
Course
DBIA









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
DBIA
Course
DBIA

Document information

Uploaded on
October 30, 2024
Number of pages
14
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

©EMILLECT 2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED

FIRST PUBLISH OCTOBER 2024




DBIA: Principles of Design-Build and Post

Award & Contracts Exam Questions and

Answers


Federal Government passed bond requiring payment and performance bonds on all public works, what

year? - ANSWER✔✔-Miller Act 1935


Bill directing A/E's selected on qualifications, what year? - ANSWER✔✔-Brooks Bill 1972


Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing

Design-Build. - ANSWER✔✔-Clinger Cohen Act/Defense Procurement Reform Act 1996


The level of quality that any average Design Professional would be able to perform given the

circumstances. - ANSWER✔✔-Standard of Care


Slowest Project Delivery method, linear in nature, prescriptive (owner knows what they want), -

ANSWER✔✔-Design Bid Build


Project Delivery - Many contracts through Owner - ANSWER✔✔-Multi Prime




Page 1/14

, ©EMILLECT 2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED

FIRST PUBLISH OCTOBER 2024




Project Delivery method allowing the contractor to come on board very early in design for

preconstruction services yet maintains separation between Designer and Builder contractually. -

ANSWER✔✔-CM at Risk


Fastest Project Delivery method, fast tracking possible overlapping design with construction utilizing

incremental packages. - ANSWER✔✔-Design Build


Procurement Method - Most Familiar - ANSWER✔✔-Low Bid


Procurement Method - Common for A/E - ANSWER✔✔-Negotiated (Qualifications Based)


Procurement Method - Qualifications and Price - ANSWER✔✔-Best Value


Procurement Method - Direct - ANSWER✔✔-Sole Source


Contract Format w/ agreed upon fixed price - ANSWER✔✔-Lump Sum


Contract Format - contractor reimbursed for actual cost plus an agreed upon percentage - ANSWER✔✔-

Cost Plus Fee


Contract Format - Combines Cost-Plus & Lump-Sum, contractor reimbursed for actual cost plus a fee only

up to a certain amount. - ANSWER✔✔-GMP (Guaranteed Maximum Price)


Contract Format - cost per piece - ANSWER✔✔-Unit Price




Page 2/14

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Emillect West Virginia University
View profile
Follow You need to be logged in order to follow users or courses
Sold
28
Member since
1 year
Number of followers
2
Documents
3004
Last sold
2 months ago
GOLDEN ORCHIDS STORE.

On this page, you find all documents, package deals, and flashcards offered by seller Emillect.

3.0

4 reviews

5
1
4
0
3
2
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions