ACTUAL QUESTIONS AND CORRECTLY
WELL DEFINED ANSWERS LATEST 2024 –
2025 ALREADY GRADED A+
Total Adjusted Contract Price - ANSWERS-The Total Contract Price as it is adjusted
through the issuance of Change Orders and the calculation of as-built quantities.
Total Contract Price - ANSWERS-The correctly determined summation of lump
sum bids and products of all quantities for Items shown in the Proposal multiplied
by the unit prices bid.
as-built quantity - ANSWERS-The quantity of a completed Item eligible for
payment
Acceptance - ANSWERS-The written acceptance by the Department of the Work.
, acceptance testing - ANSWERS-Testing conducted by the Department to measure
the degree of compliance to the Contract
actual cost - ANSWERS-The computed cost using calculations provided
addendum - ANSWERS-A Contract revision or response to a Contractor inquiry
issued after advertisement and before the opening of bids.
authorized funding amount - ANSWERS-The amount of funds authorized by the
Department for the Contract
Bidder - ANSWERS-The individual, firm, partnership, corporation, joint venture, or
any acceptable combination thereof that submits a bid to the Department.
bridge - ANSWERS-. A structure, other than a culvert, including supports, erected
over a depression or an obstruction, such as water, highway, or railway, and
having a track or passageway for carrying traffic or other moving loads and having
a length 3 measured along the center of the structure of more than 20 feet
between undercopings of abutments or extreme ends of openings for multiple
boxes. Structure dimensions are defined as follows:
bridge length - ANSWERS-The overall length measured along the line of survey
stationing from back to back of backwalls of abutments, if present, otherwise end