Actual Exam Questions and CORRECT
Answers
Under Dispenser Containment is required to be designed and constructed in accordance with
____.
a. the appropriate Executive Order
b. generally accepted secondary containment practices
c. standards of an independent testing organization with industry code
d. an engineering specification approved by a state registered professional engineer or
engineering standard - CORRECT ANSWER✔✔- c. standards of an independent testing
organization with industry code
With a Gilbarco Vapor-Vac, the OPW 12VW nozzle has a hole or tear in the vapor escape
guard, it is a defect if ____% of the circumference is missing.
a. 25%
b. 75%
c. 50%
d. 65% - CORRECT ANSWER✔✔- b. 75%
Gasoline thread sealant can be used on all except _____.
a. threaded portion of rotatable adapters
b. p/v valve
c. ball float
d. riser adapter - CORRECT ANSWER✔✔- a. threaded portion of rotatable adapters
when installing copper tubing use all except _____.
, a. copper tubing cutter
b. copper bending tool
c. copper flaring tool
d. copper stretching tool - CORRECT ANSWER✔✔- d. copper stretching tool
The Husky P/V valve has a torque range of...
a. 50-75 lbs
b. 20-50 lbs
c. 30-50 lbs
d. 40-50 lbs - CORRECT ANSWER✔✔- b. 20-50 lbs
When installing the hanging hardware together use...
a. pipe dope
b. non-hardening sealant
c. teflon tape
d. oil or grease - CORRECT ANSWER✔✔- d. oil or grease
When installing in the EO VR-101-E you should have on site _____.
a. the executive order
b. Phil-tite installation manual
c. the equipment checklist
d. all the above - CORRECT ANSWER✔✔- d. all the above
There are four ball valves on the clean air separator, what position are they to be in?
a. top and bottom valve open, the rest are closed
b. top and bottom valve closed, the rest are open