AGILE Exam UPDATED Actual Exam Questions and CORRECT Answers What are the 2 perspectives in Kanban - CORRECT ANSWER- 1) Kanban stand alone Agile approach (ex: replace scrum w/ kanban) 2) parts of Kanban used with other Agile approaches (ex: scrum board, WIP limits in SAFe) what are the 5 basic features of Kanban - CORRECT ANSWER- 1) meeting only on demand none on process 2) highly visual which allows team to fix bottlenecks 3) prevents work from being designated as "done" before it really is complete 4) enforce quality in every step

Show more Read less
Institution
Agile
Course
Agile










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Agile
Course
Agile

Document information

Uploaded on
September 24, 2024
Number of pages
20
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

AGILE Exam UPDATED Actual Exam
Questions and CORRECT Answers
What are the 2 perspectives in Kanban - CORRECT ANSWER✔✔- 1) Kanban stand alone
Agile approach (ex: replace scrum w/ kanban)
2) parts of Kanban used with other Agile approaches (ex: scrum board, WIP limits in SAFe)


what are the 5 basic features of Kanban - CORRECT ANSWER✔✔- 1) meeting only on
demand none on process
2) highly visual which allows team to fix bottlenecks
3) prevents work from being designated as "done" before it really is complete
4) enforce quality in every step
5) minimize WIP


basic process - CORRECT ANSWER✔✔- 1) take item from backlog
2) specify work needed to implement it
3) implement it
4) validate it works
5) deliver to customer


process board steps - CORRECT ANSWER✔✔- backlog
specify work
implement
validate


how do we limit chaos in Kanban - CORRECT ANSWER✔✔- by limiting WIP



why do we limit WIP? - CORRECT ANSWER✔✔- Because it decreases work affected
when changing priority/requirements of design


which way are items pulled on the board? - CORRECT ANSWER✔✔- left --> right

,do you define "done" at every step? - CORRECT ANSWER✔✔- yes, each step has own
definition of done


who verifys the rule were followed and that it is complete? - CORRECT ANSWER✔✔- a
team member that is different than the person responsible


why is maintaining a good flow hard? - CORRECT ANSWER✔✔- blocks
unusual events
too busy
new person on team
working with improvements


what are unusual events - CORRECT ANSWER✔✔- waiting for external output
major bugs
reviews
demo


how to add item to backlog - CORRECT ANSWER✔✔- -customer decides
-team decides


is implementation fast with kanban? - CORRECT ANSWER✔✔- yes very fast since WIP is
small


what are the categorization levels when doing the backlog - CORRECT ANSWER✔✔-
MVP 0 = must have
Priority 1 = should have
Priority 2 = like to have
Priority 3 = nice idea

, what question do you ask to know if it is an MVP? - CORRECT ANSWER✔✔- Would you
hold up the release for that item?


How do you score/ divide up work - CORRECT ANSWER✔✔- -have tasks roughly the
same size (break large items into smaller tasks)
-use relative # of tasks to determine size of item


how can you see the progress of work? - CORRECT ANSWER✔✔- cumulative flow
diagram
-shows pending, active, and done projects


are Kanban and Scrum both agile methodologies? - CORRECT ANSWER✔✔- yes



does Kanban have PO or SM - CORRECT ANSWER✔✔- no


if they are transitioning from Scrum --> Kanban will the team share the roles of PO and SM?
- CORRECT ANSWER✔✔- yes



is there a time box/ sprint with Kanban? - CORRECT ANSWER✔✔- No



In Kanban is the flow of work interrupted? - CORRECT ANSWER✔✔- No it is continuous


Does Kanban have Sprint Planning, Sprint Review, or Sprint Retrospective? - CORRECT
ANSWER✔✔- No



Difference between daily meetings - CORRECT ANSWER✔✔- Kanban- 1 question: "what
impediments stand in the way?"


Do scrum teams use boards to identify evolution of work in sprint? - CORRECT
ANSWER✔✔- yes



when to use Kanban - CORRECT ANSWER✔✔- -less structured and less overhead

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MGRADES Stanford University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1044
Member since
1 year
Number of followers
100
Documents
68977
Last sold
16 hours ago
MGRADES (Stanford Top Brains)

Welcome to MGRADES Exams, practices and Study materials Just think of me as the plug you will refer to your friends Me and my team will always make sure you get the best value from the exams markets. I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3.8

166 reviews

5
72
4
30
3
42
2
8
1
14

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions