100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Lean Six Sigma Yellow Belt Exam Questions with Correct Answers

Rating
-
Sold
-
Pages
11
Grade
A+
Uploaded on
11-09-2024
Written in
2024/2025

1-1. What does DMAIC stand for? A. Define, Measure, Analyze, Implement, Continue B. Develop, Metrics, Attributes, Identify, Control C. Define, Measure, Analyze, Implement, Control D. Define, Measure, Analyze, Improve, Control - Answer-1. D Define, Measure, Analyze, Improve, Control are the 5 phases. 1-2. What is the objective of a Six Sigma project? A. Reduce Variation B. Reduce Variation and/or Shift the Mean C. Shift the Mean D. Eliminate waste - Answer-1-2. B Depending on the project, Six Sigma can be used to both shift the mean and reduce variation. 1-3. True or False: A Six Sigma Yellow Belt is equipped to lead a complex Six Sigma project. A. True B. False - Answer-1-3. B False. Six Sigma Yellow Belts are trained to lead localized projects and do not possess the subject matter expertise to lead a complex project. 1-4. True or False: Keeping the Y=f(x) equation in mind, in order to improve a process, focus should be placed on Y rather than the X's. A. True B. False - Answer-1-4. B False. In order to see a shift in the Y metric, concentration must be placed on the X's. 1-5. True or False: Each phase of the Six Sigma DMAIC method has specific deliverables that must be satisfied before moving into another phase. A. True B. False - Answer-1-5. A

Show more Read less
Institution
Six Sigma Yellow Belt Certification
Course
Six Sigma Yellow Belt Certification









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Six Sigma Yellow Belt Certification
Course
Six Sigma Yellow Belt Certification

Document information

Uploaded on
September 11, 2024
Number of pages
11
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Lean Six Sigma Yellow Belt Exam
Questions with Correct Answers
1-1. What does DMAIC stand for?

A. Define, Measure, Analyze, Implement, Continue
B. Develop, Metrics, Attributes, Identify, Control
C. Define, Measure, Analyze, Implement, Control
D. Define, Measure, Analyze, Improve, Control - Answer-1. D

Define, Measure, Analyze, Improve, Control are the 5 phases.

1-2. What is the objective of a Six Sigma project?

A. Reduce Variation
B. Reduce Variation and/or Shift the Mean
C. Shift the Mean
D. Eliminate waste - Answer-1-2. B

Depending on the project, Six Sigma can be used to both shift the mean and reduce
variation.

1-3. True or False: A Six Sigma Yellow Belt is equipped to lead a complex Six Sigma
project.

A. True
B. False - Answer-1-3. B

False. Six Sigma Yellow Belts are trained to lead localized projects and do not possess
the subject matter expertise to lead a complex project.

1-4. True or False: Keeping the Y=f(x) equation in mind, in order to improve a process,
focus should be placed on Y rather than the X's.

A. True
B. False - Answer-1-4. B

False. In order to see a shift in the Y metric, concentration must be placed on the X's.

1-5. True or False: Each phase of the Six Sigma DMAIC method has specific
deliverables that must be satisfied before moving into another phase.

A. True
B. False - Answer-1-5. A

, True. Each phase of DMAIC has specific tools and techniques that must be completed
with the Six Sigma Core Team and/or extended stakeholders in order to successfully
close out a phase.

2-1. Which of the following process maps is constructed in the Define Phase?

A. Detailed Process Map
B. Value Stream Map
C. Cross-Functional Map
D. SIPOC / COPIS - Answer-2-1. D

The SIPOC / COPIS is created during Define with the others in Measure and/or
Analyze.

2-2. True or False: When gathering the Voice of the Customer (VOC), both internal and
external stakeholders should be considered.

A. True
B. False - Answer-2-2. A

True. All perspectives of the process, product, or service in question should be
considered from both customer types.

2-3. True or False: When gathering the VOC, a VOC Plan should be completed by the
Six Sigma Belt leading the project.

A. True
B. False - Answer-2-3. B

False. The VOC Plan must be constructed with the entirety of the Six Sigma Core
Team.

2-4. True or False: The CTQ Tree is constructed using the VOC as input, which is then
translated into characteristics and attributes that can be measured.

A. True
B. False - Answer-2-4. A

True. The VOC serves as the pivot point, providing valuable insight into necessary
process characteristics needed to satisfy the VOC.

2-5. True or False: The Cost of Poor Quality Iceberg is important as it tells an
organization to focus on the issues and challenges which are already visible.

A. True

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
lectknancy Boston University
View profile
Follow You need to be logged in order to follow users or courses
Sold
283
Member since
2 year
Number of followers
28
Documents
25966
Last sold
5 days ago

3.6

57 reviews

5
23
4
10
3
11
2
3
1
10

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions