100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

Voice, Data, and Video Exam (100 out of 100) Questions and Verified Answers (GRADED A) Latest Update 2024

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
04-09-2024
Written in
2024/2025

Voice, Data, and Video Exam (100 out of 100) Questions and Verified Answers (GRADED A) Latest Update 2024

Institution
VDV
Course
VDV









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
VDV
Course
VDV

Document information

Uploaded on
September 4, 2024
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Voice, Data, and Video Exam (100 out of 100) Questions and
Verified Answers (GRADED A) Latest Update 2024


What is firestopping

A material or mechanical device used to block openings and walls, ceilings, or floors to prevent the
passage of fire or smoke




what does the acronym UTP stand for

unshielded twisted pair




what are the transmission rates of cat 3 cable

16 megahertz




what is the most common shield used on RG6 coax

tri shield and quad shield are the most common




structured cabling systems are divided into how many subsystems and what are they

5

-campus backbone subsystem

-equipment room subsystem

-riser subsystem

-horizontal cabling subsystem

-work area subsystem



Ask for any Exams or Study materials from ()

, describe a work area subsystem

telecommunications outlets at the end user location and the associated patch cables providing final
connectivity




on a campus backbone subsystem cable where should the label be placed

on conduit within 6 inches of the termination point

on innerduct within 12 inches of the termination point




what is the rule regarding motors and transformers then an equipment / Telecom room

Telecom cable must be kept 48 inch away from the motors and transformers




all incoming conduit and innerduct should include

firestopping




on a riser subsystem all conduit should be

raised and pushed on each end and have no more than two 90-degree bends between pull points or pull
boxes




any penetrations through walls or floors that we are required for the riser pathways must

be neatly sleeved and fire stopped immediately upon completing the penetration




Ask for any Exams or Study materials from ()

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Abdinurse Walden University
View profile
Follow You need to be logged in order to follow users or courses
Sold
26
Member since
1 year
Number of followers
4
Documents
992
Last sold
2 weeks ago

4.8

34 reviews

5
31
4
2
3
0
2
0
1
1

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions