QUESTIONS AND CORRECT DETAILED
ANSWERS (VERIFIED ANSWERS) ALREADY
GRADED A
When does the CGP apply? - CORRECT ANSWER >>Any construction or
demolition of one acre or more
Activities under the CGP include:
a. Routine maintenance to maintain original line and grade, hydraulic
capacity, or original purpose of the facility.
b. Disturbances to land surfaces solely related to agricultural operations.
c. Clearing and grading 2 acres of land
d. Discharges of storm water from areas on tribal lands. - CORRECT
ANSWER >>C
TRUE OR FALSE: if construction of an LUP will occur across several
properties, the utility company, municipality, or other public/private
company/agency that owns or operates the LUP project is responsible for
obtaining coverage - CORRECT ANSWER >>True
Risk Level 2 monitoring requirements include:
a. Effluent sampling where applicable
b. Sampling for pH and turbidity
c. Sampling for pH, turbidity, and suspended sediments - CORRECT
ANSWER >>B
, All NAL data must be uploaded within ___ after NAL exceedance has been
identified
a. 24 hours
b. 1 week
c. 10 days
d. 2 weeks - CORRECT ANSWER >>C
Who must file Permit Registration Documents (PRDs) prior to the
commencement of construction activity?
a. Qualified SWPPP Developer (QSD)
b. Legally Responsible Person (LRP) or the LRP's Approved Signatory
c. Qualified SWPPP Practitioner (QSP)
d. The CEO - CORRECT ANSWER >>B
Which regulation establishes a framework for regulating municipal and
industrial storm water discharges to waters of the United States:
a. Clean Water Act (CWA)
b. Porter-Cologne Water Quality Control Act
c. Endangered Species Act
d. U.S. Environmental Protection Agency (USEPA)
e. California Environmental Quality Act (CEQA) - CORRECT ANSWER
>>A
Certain non-storm water discharges may be necessary for the completion
of construction projects. Therefore the General Permit authorizes such
discharges provided they meet the following conditions except: