100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

BOMI - The Design, Operation & Maintenance of Building Systems, Part I Questions And Answers Graded A+

Rating
-
Sold
7
Pages
7
Grade
A+
Uploaded on
13-07-2024
Written in
2023/2024

A change in a project is a made due to errors/emissions - Constructive change A condenser that consists of a welded steel shell containing a number of straight tubes fastened in tube sheets that close the shell - Shell-and-tube condenser A heat pump that takes heat from the outdoor air and rejects it to the inside space in the winter. In the summer, the reverse happens-heat from indoors in rejected outside. Most commonly found in residential and smaller commercial applications, due to being cheap to install. - Air-to-air heat pumps A metal that has poor acoustical properties - Aluminum A stone that is fireproof, requires little maintenance, but expensive - Slate A strategy that monitors heating and cooling loads in the building spaces and adjusts the discharge air temperature to the most efficient levels to satisfy the measured load. This works best with constantvolume systems. - Supply-air reset (SAR) A type of system that the airstream flows constantly through the ducts, and the temperature and humidity of that air varies - Constant-air-volume system A type of system where the air is controlled at a relatively constant temperature and moisture content. This system has sufficient static pressure, and has greater energy savings than constant-volume systems. - Variable-air-volume (VAV) system Air flows actually, in a straight line through the impeller - Axial flow fans Air flows radially, along the radius through the impeller - Centrifugal fansAir-conditioning systems can cool air using refrigerant that is directly fed into a copper coil - Direct expansion (DX) system An owner disrupts work in a project - Disruptive change Architectural firm is hired and serves as the owners agent. Their primary responsibility is providing and managing the design and construction documents for the project; traditional method. - DesignBid-Build Between the owner and contractor wherein the owner agrees to pay the contractor a specified sum of money for completing a project consisting of a variety of specified items of work. Results in low construction costs with minimal change orders. - Lump Sum Contract Bringing a property into conformity with changes in style, whether interior or exterior - Modernization Commonly used in household refrigerators - Natural-draft Air-cooled condensers Compression and tensile strength mortar - Type S Determined by the pressure differential induced by the compressor. Heat is absorbed in the evaporator, raised to a higher temperature by the compressor, and a given off by the condenser - Rate of evaporation Devices that convert signals from one medium to another - Transducers Due to this condenser being constructed with finned-tube coil, a fan with motor, and a casing, it eliminates the need for a cooling tower. - Forced-draft Air-cooled condenser Dynamic state - Pump runningEnabling one manufacturers controls to be programmed and operated from another manufacturers system - Interoperability Energize groups of electric heating elements in stages or steps to minimize temperature fluctuations - Step controllers High-compressions strength mortar - Type M In smaller sizes, the high speed backward-inclined and airfoil fans may increase and noise level. For the same volume of air, the lower speeds of _______________ is more desirable for smaller applications. - Forward curve fans Lime cement that hardens by drying out - Nonhydraulic Lime cement that mainly needs to dry out, but has some hydraulic properties - Semihydraulic Lime cement that sets by combining water - Hydraulic

Show more Read less
Institution
BOMI - The Design, Operation & Maintenance Of Buil
Course
BOMI - The Design, Operation & Maintenance of Buil









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
BOMI - The Design, Operation & Maintenance of Buil
Course
BOMI - The Design, Operation & Maintenance of Buil

Document information

Uploaded on
July 13, 2024
Number of pages
7
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brainarium Delaware State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1826
Member since
2 year
Number of followers
1043
Documents
22338
Last sold
4 days ago

3.8

317 reviews

5
147
4
60
3
54
2
16
1
40

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions