What types of waste are related to JIT? - ANSWER- Inventory
Waiting
Motion and movement
Transportation
Overproduction
Overprocessing
Defects
A firm that uses JIT would most likely use a group technology production system
to ____? - ANSWER- A group technology production system may be used to make
several different, but related, parts. The idea behind GT is that each part follows the
same essential processing sequence which can reduce set up time.
Employee empowerment - ANSWER- Extending employee responsibility and
authority to the lowest levels of an organization
A new, energy-efficient furnace is being installed in a steel factory. Because it
would have added 10% to the cost of the furnace, management has decided not to
install the optional safety override for the furnace. This decision is most likely to
lead to which of the following? - ANSWER- An increase in legal costs
Refers to the organizational issue of balancing financial profitability with
environmental responsibility - ANSWER- sustainability
Operations managers rarely become involved with worker safety or environmental
pollution complaints because such ethical issues are only handled by an
organizations legal department. True or False - ANSWER- False
Downloaded by: Karimiowen192 | Want to earn $1.236
Distribution of this document is illegal extra per year?
,SWOT analysis is used as a ______ tool when a firm crafts a strategy that helps
distinguish itself among competitors, develops competitive advantages, and avoids
barriers within the business environment. - ANSWER- strategic
The difference between the lowest cost producer of a good and the next lowest cost
producer of the same good is known as a - ANSWER- Relative advantage
Characteristics associated with a perpetual inventory system - ANSWER- -when a
company needs to know exact inventory balances at all times
-when a company wants accurate financial statements
Under what two conditions should I periodic review system be adopted -
ANSWER- -When a supplier will only deliver at a specific interval
-when a company must manually track inventory levels
SWOT analysis is used as a ___ tool when used to uncover exploitable
opportunities within the competitive landscape. - ANSWER- simple
What best describes a competitive advantage? - ANSWER- A capability valued by
customers that gives a firm in edge over its rivals
A technique used to analyze the flow of materials, ideas, and information to
understand how processes function. Each activity in the process is defined as a
value added or non-value added - ANSWER- Value stream mapping
In a JIT environment, the master schedule usually has a ____ planning horizon. -
ANSWER- 2-3 month
What production system uses general purpose machinery and is level scheduled? -
ANSWER- JIT
What indicates the quantities of component parts that will be made each day, because
leadtimes are usually short in a JIT environment - ANSWER- Final assembly
schedule
Which technique should a company adopt to keep a smooth production process? -
ANSWER- Level schedule
Downloaded by: Karimiowen192 | Want to earn $1.236
Distribution of this document is illegal extra per year?
, What helps to reduce set up time in a JIT system? - ANSWER- Placing the needed
tools and equipment in predetermined locations and shortening the downtime of
equipment
Why is the movement of materials simplified in a JIT system? - ANSWER- Parts
are moved by hand
Downloaded by: Karimiowen192 | Want to earn $1.236
Distribution of this document is illegal extra per year?
EXAM 200 QUESTIONS AND CORRECT
DETAILED ANSWERS (VERIFIED
ANSWERS)|A+GRADE
What types of waste are related to JIT? - ANSWER- Inventory
Waiting
Motion and movement
Transportation
Overproduction
Overprocessing
Defects
A firm that uses JIT would most likely use a group technology production system
to ____? - ANSWER- A group technology production system may be used to make
several different, but related, parts. The idea behind GT is that each part follows the
same essential processing sequence which can reduce set up time.
Employee empowerment - ANSWER- Extending employee responsibility and
authority to the lowest levels of an organization
A new, energy-efficient furnace is being installed in a steel factory. Because it
would have added 10% to the cost of the furnace, management has decided not to
install the optional safety override for the furnace. This decision is most likely to
lead to which of the following? - ANSWER- An increase in legal costs
Refers to the organizational issue of balancing financial profitability with
environmental responsibility - ANSWER- sustainability
Operations managers rarely become involved with worker safety or environmental
pollution complaints because such ethical issues are only handled by an
organizations legal department. True or False - ANSWER- False
Downloaded by: Karimiowen192 | Want to earn $1.236
Distribution of this document is illegal extra per year?
,SWOT analysis is used as a ______ tool when a firm crafts a strategy that helps
distinguish itself among competitors, develops competitive advantages, and avoids
barriers within the business environment. - ANSWER- strategic
The difference between the lowest cost producer of a good and the next lowest cost
producer of the same good is known as a - ANSWER- Relative advantage
Characteristics associated with a perpetual inventory system - ANSWER- -when a
company needs to know exact inventory balances at all times
-when a company wants accurate financial statements
Under what two conditions should I periodic review system be adopted -
ANSWER- -When a supplier will only deliver at a specific interval
-when a company must manually track inventory levels
SWOT analysis is used as a ___ tool when used to uncover exploitable
opportunities within the competitive landscape. - ANSWER- simple
What best describes a competitive advantage? - ANSWER- A capability valued by
customers that gives a firm in edge over its rivals
A technique used to analyze the flow of materials, ideas, and information to
understand how processes function. Each activity in the process is defined as a
value added or non-value added - ANSWER- Value stream mapping
In a JIT environment, the master schedule usually has a ____ planning horizon. -
ANSWER- 2-3 month
What production system uses general purpose machinery and is level scheduled? -
ANSWER- JIT
What indicates the quantities of component parts that will be made each day, because
leadtimes are usually short in a JIT environment - ANSWER- Final assembly
schedule
Which technique should a company adopt to keep a smooth production process? -
ANSWER- Level schedule
Downloaded by: Karimiowen192 | Want to earn $1.236
Distribution of this document is illegal extra per year?
, What helps to reduce set up time in a JIT system? - ANSWER- Placing the needed
tools and equipment in predetermined locations and shortening the downtime of
equipment
Why is the movement of materials simplified in a JIT system? - ANSWER- Parts
are moved by hand
Downloaded by: Karimiowen192 | Want to earn $1.236