100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CDT exam Questions with Correct Answers (solved)

Rating
-
Sold
-
Pages
16
Grade
A+
Uploaded on
06-05-2024
Written in
2023/2024

CDT exam Questions with Correct Answers (solved) 1. The method of computation of Contractor's overhead and profits for Change Order prices, where both additions and deletions are involved, is found in the: a) Agreement. b) Conditions of the Contract. c) Division 01. d) Instructions to Bidders. - CORRECT ANSWER-b) Conditions of the Contract. 2. General Requirements are part of: a) Supplementary Conditions. b) Bidding Requirements. c) Specifications. d) Summary of Work. - CORRECT ANSWER-c) Specifications. 3. The three essential considerations in the evaluation of a product are: a) Requirements, Criteria, and Tests. b) Costs, Maintenance, and Installation. c) Life Cycle Cost, Installation Cost, and Maintenance Cost. d) Case studies, Failures, and Problems. - CORRECT ANSWER-a) Requirements, Criteria, and Tests. 4. Whose responsibility is it to furnish the Shop Drawings? a) The Architect/Engineer b) The Contractor c) The Owner d) The Subcontractor - CORRECT ANSWER-b) The Contractor 5. The division of the Work among multiple prime Contracts is described in: a) Instructions to Bidders. b) Supplementary Conditions. c) Division 01. d) Special Conditions. - CORRECT ANSWER-c) Division 01. 6. During the Project Conception Stage, the A/E may be retained to: a) Develop outline specifications b) Describe the character of the mechanical system c) Prepare renderings d) Assist in financial feasibility studies - CORRECT ANSWER-d) Assist in financial feasibility studies 7. What is the main purpose of MasterFormat? a) for scheduling, value management, recording of design data and managing costs. b) used during the planning stage of a project. c) to organize the Project Manual, reference keynotes and detailed cost estimates. d) when there is a standardized need for information to appear upon each page of a project manual. - CORRECT ANSWER-c) to organize the Project Manual, reference keynotes and detailed cost estimates. 8. The person who becomes secondarily liable for another's debt or performance is called the: a) Guarantee b) Warrantor c) Guarantor d) Warrantee - CORRECT ANSWER-c) Guarantor 9. Integrated projects are distinguished by all of the following characteristics except: a) Development of virtual project model through input from a collaborative team b) Trust-based collaboration between project team members c) Maximized efficiency through design, fabrication, and construction d) "Just as needed" team involvement to reduce owner's pre-construction expenses - CORRECT ANSWER-d) "Just as needed" team involvement to reduce owner's preconstruction expenses 10. Outline Specifications are written for a) only Divisions 02-14 where actual products are discussed b) Divisions 01-49 c) only Divisions 01-14 (excluding mechanical and electrical) d) the exclusive use of the A/E - CORRECT ANSWER-b) Divisions 01-49 11. An example of a MasterFormat Level 3 specification Section is: a) 05 00 00 Metals. b) 05 20 00 Metal Joists. c) 05 21 00 Steel Joist Framing. d) 05 21 19 Open Web Steel Joist Framing. - CORRECT ANSWER-d) 05 21 19 Open Web Steel Joist Framing. 12. What activities take place in the Project Conception Stage? a) The engineers develop the mechanical and electrical systems. b) The site is selected and the demolition is done. c) Feasibility studies and budget is set. d) The program is evaluated and the engineers are selected. - CORRECT ANSWER-c) Feasibility studies and budget is set. 13. The document recommended to organize preliminary construction information into a standard order on the basis of systems and assemblies is: a) MasterFormat b) Uniformat c) Outline Specifications d) Project Manual - CORRECT ANSWER-b) Uniformat 14. All design and construction drawings can be classified as one of two types of views: a) Numeric and graphic. b) Vertical and horizontal. c) Scaled and nonscaled. d) Exterior and interior. - CORRECT ANSWER-c) Scaled and nonscaled. 15. Substitution requirements and procedures during bidding a) Are not allowed under most public bidding statutes. b) Are modified by the Supplementary Conditions. c) Are stated in the Instructions to Bidders. d) Are provided by requests by telephone. - CORRECT ANSWER-c) Are stated in the Instructions to Bidders. 16. Submittal requirements for Mechanical and Electrical work are specified in: a) General Conditions b) Supplementary Conditions c) Division 01 d) Division 22 and 26 - CORRECT ANSWER-c) Division 01 17. The Procurement Requirements are a) a part of the Procurement Documents, but not the Contract Documents. b) a part of the Contract Documents. c) a part of the Procurement Documents but not the Project Manual. d) in the same part as the Contract Modifications. - CORRECT ANSWER-a) a part of the Procurement Documents, but not the Contract Documents. 18. Since he or she is most familiar with a product, the manufacturer's representative should: a) Write the specification section. b) Review the specification section. c) Supply accurate information to the A/E d) Not be consulted in order to avoid a conflict of interest. - CORR

Show more Read less
Institution
CDT
Course
CDT










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CDT
Course
CDT

Document information

Uploaded on
May 6, 2024
Number of pages
16
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
StudyCenter1 Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
221
Member since
2 year
Number of followers
91
Documents
3852
Last sold
1 month ago
Nursing school is hard! Im here to simply the information and make it easier!

My mission is to be your LIGHT in the dark. If you"re worried or having trouble in nursing school, I really want my notes to be your guide! I know they have helped countless others get through and thats all i want for YOU! Stay with me and you will find everything you need to study and pass any tests,quizzes abd exams!

4.3

27 reviews

5
18
4
4
3
3
2
0
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions