Traffic Signal Technician Level 1 (New 2024/ 2025 Update) Questions and Verified Answers| Grade A| 100% Correct
Traffic Signal Technician Level 1 (New 2024/ 2025 Update) Questions and Verified Answers| Grade A| 100% Correct QUESTION Typical back-up battery systems provide battery power in case of an outage to a signal for: Answer: 2 to 6 hours QUESTION A major distinguishing feature between NEMA TS-1 and TS-2 controllers is: Answer: Data bus QUESTION The advanced transportation controller was developed to provide: Answer: Open architecture hardware and software platform QUESTION Which of the following type of controller assemblies, without adapters, can accept multiple software platforms and be utilized in all types fo cabinets: Answer: 2070 controller QUESTION What is another term for load switches used in 170/2070 controllers? Answer: switch packs QUESTION Which type of controller was introduced to supersede the 170 controller? Answer: 2070 controller QUESTION the NEMA TS-2 standards cover the same items as the TS-1 standards but expand the requirements to include which of the following: Answer: Treatment fo signal preemption QUESTION What is NOT part of an underground power service: Answer: Conduit rise with weatherhead QUESTION Two common types of signal pole installations are Answer: Direct buried and foundation QUESTION The first type of testing performed on a controller cabinet assembly is Answer: bench test QUESTION the second type of test performed on a controller cabinet assembly is Answer: field test QUESTION continuity is a type of test for
Written for
- Institution
- IMSA
- Course
- IMSA
Document information
- Uploaded on
- April 4, 2024
- Number of pages
- 29
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- imsatraffic signal
-
traffic signal technician level 1 new
-
the second type of test performed on a controller
-
typical back up battery systems provide battery p
-
imsatraffic signal technician level iisma
Also available in package deal