100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

DEMOLITIONS EXAM ACTUAL EXAM 70 QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES|ALREADY GRADED A

Rating
-
Sold
-
Pages
10
Grade
A+
Uploaded on
15-11-2023
Written in
2023/2024

DEMOLITIONS EXAM ACTUAL EXAM 70 QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES|ALREADY GRADED A Which method of attack is preferred on a steel truss deck bridge with top supports? - ANSWER- bottom attack Using the Hasty method, how many total packages of C4 (M112) would be required to breach a reinforced concrete wall, which is 7 feet thick, and 16 feet wide, using elevated untamped charges? - ANSWER- 200 What is the value of "k" when you are destroying a 5-foot thick dense concrete wall using external charge? - ANSWER- 0.41 Using a minimum amount of explosives, how many packages of M112 are required to cut 11 trees with an average diameter of 34 inches? - ANSWER- 33 trees Using the Hasty method, how many total packages of M112 are needed for a shallow water placed charge on a 3-foot thick Dense concrete first class masonry wall? - ANSWER- 19 How many packages of M112 are required to cut 11 trees, 34 inches in diameter using a timber cutting charge? Calculate for minimum charge size. - ANSWER- 33 pkgs Which road crater produces the least effective barrier? - ANSWER- Hasty Using a minimum amount of M112, how many packages are required to cut an I-beam with the following dimensions: flange 8" X 1" thick and web 14" X 1" thick? - ANSWERnot 3 or 4 How many total pounds of TNT are required to construct a relieved-face road crater with a road width measuring 55 feet? - ANSWER- 740 How many Composition H6 cratering charges are needed to destroy an abutment that is 5 feet thick, 15 feet high, and 42 feet wide? - ANSWER- 8 Using the minimum amount of explosives, how many total packages of M112 will be required to cut an alloy steel shaft 22" in circumference? - ANSWER- not 5 How many packages of military dynamite (M1) are required to create a relieved-face crater that is 120 feet long? - ANSWER- not 1160 Using the minimum amount of explosives, how many total packages of C4 (M112) will be required to cut a mild steel bar that is 14 inches in circumference? - ANSWER- 3 How many one-pound packages of TNT are required to cut 90 trees 35 inches in diameter using an external charge? - ANSWER- 2790 Using the Hasty Method, what is the amount of M112 needed for an internal charge at the center of a 5-foot thick dense concrete wall? - ANSWER- not 9 Using a block charge, how many one-pound packages of TNT are required when your squad has been given the mission to cut eight steel I-beams with the dimensions of: flanges 15" x 1" thick and web 32" x 1"? - ANSWER- 192 How many packages of TNT are required to create a relieved-face crater that is 125 feet long? - ANSWER- 1230 Using the minimum amount of explosives, how many total packages of M112 are required to cut 17 trees, 24 inches in diameter? - ANSWER- 34 What is the correct DD form for preparing a breaching reconnaissance record? - ANSWER- DD 3020 Using the Hasty method, what is the total amount of M112 (in 1.25 lb. packages) needed for a ground placed untamped charge on a 6-foot thick first class masonry wall? - ANSWER- 206 Which of the following should the reconnaissance orders detail the reconnaissance party to determine? - ANSWER- firing system How many cratering charges and how many packages of M112 C-4 are needed to create a deliberate crater 105 feet long? - ANSWER- 29 cratering charges + 38 packages of M112 C-4 How many total pounds of TNT are required to create an abatis that has 72 trees with an average diameter of 30 inches? - ANSWER- 1296 How many packages of C4 (M112) are required to cut 14 trees with the average diameter of 29 inches using a ring charge? - ANSWER- 182 Using deck bridge, bottom support, method III, which method of attack is preferred on a concrete deck bridge when the supports and the total end clearance (E) is less than the required end clearance (ER)? - ANSWER- top attack How many pounds of TNT are required to create a hasty road crater 6 feet deep and 120 feet long? - ANSWER- 1320 What is the required end clearance (ER) for a steel-beam deck bridge which has the following measurements? H = 1.8m L = 35m - ANSWER- 0.24m Using an external timber cutting charge, how many one-pound packages of TNT are required to cut 100 trees with an average of 36 inches in diameter? - ANSWER- 3300 If the obstacle folder is unavailable, which report is used in its place? - ANSWERBreaching Reconnaissance Record How many 40-pound ammonium nitrate cratering charges and packages of C-4 are needed to destroy a bridge abutment that is 5 feet thick, 18 feet high, and 35 feet wide? - ANSWER- 6 CC and 12 packages of M112 What is the required length of span removed (LC) for a bowstring bridge, which has the following measurements? H = 8m L = 85m LS = 1.55m - ANSWER- 4.67m When using the breaching reconnaissance record, which block is used for general structure description? - ANSWER- Block 11 How many total pounds of TNT are required to construct a relieved-face road crater when the roadway width measures 41 feet? - ANSWER- 530 Using the minimum amount of explosives, how many packages of M112 will be required to cut an alloy steel shaft 24" around? - ANSWER- 8

Show more Read less
Institution
DEMOLITIONS EXA
Course
DEMOLITIONS EXA









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
DEMOLITIONS EXA
Course
DEMOLITIONS EXA

Document information

Uploaded on
November 15, 2023
Number of pages
10
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
norajuma13 Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
239
Member since
2 year
Number of followers
165
Documents
3522
Last sold
2 months ago
EXCELLENT HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A EXCELLENT HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A Am an expert on major courses especially; psychology,Nursing, Human resource Manageme

EXCELLENT HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A EXCELLENT HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A Am an expert on major courses especially; psychology,Nursing, Human resource Management and Mathemtics Assisting students with quality work is my first priority. I ensure scholarly standards in my documents and that\'s why i\'m one of the BEST GOLD RATED TUTORS in STUVIA. I assure a GOOD GRADE if you will use my work.

Read more Read less
3.4

46 reviews

5
19
4
6
3
5
2
8
1
8

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions