FDNYC F60 Fireguard Exam practice Questions and Answers Latest Update | Rated 100%
FDNYC F60 Fireguard Exam practice Questions and Answers Latest Update | Rated 100%. Permits issued by the FDNY are required to conduct the following hot work:: 1)Storing, Using or Handling Oxygen and a Flammable gas 2) LPG or CNG or Acetylene in excess of 400 SCF 3) Any oxidizing gas in excess of 504 SCF 3. Portable LPG containers that are more than must NOT be stored, handled, or used indoors: 16.4 oz 4. CNG containers with a capacity greater than must NOT stored, handled, or used on the roof: 8.7 SCF 5. Use of LPG/Propane on an occupied roof requires an from licensed professional stating the roof is constructed of : Affidavit, Archi- 2 / 5 tect or Engineer, non-combustible materials 6. Any single standard portable LPG container must not exceed in weight: 100 LBS 7. Any single CNG container must not exceed SCF: 381 8. Such permit authorizes the permit holder to store, handle, or use flammable gases, or conduct a torch operation at a specific premises or location called?- : Site-specific permit 9. A may be a permanent permit or a temporary permit.: Site-specific permit 10. Under a permanent permits are valid for only: Site-specific permit, 12 months 11. Under a temporary permit may be valid from to depends on the construction/operation need.: - Site-specific permit, 1 day to 12 months 12. Such permit authorizes the permit holder to store, handle, use or sell hazardous material or conduct an operation on a citywide basis is called?- : Citywide permit 13. Such permit is valid to temporarily store, handle, use or sell hazardous materials or to conduct an operation at one or more locations is called?: Citywide 3 / 5 permit 14. Citywide permit the duration of such activity at any individual location does not exceed days: 30 calendar 4 / 5 15. Periods of activity in excess 30 calendar days at any one location shall require a : Site-specific permit 16. What should be readily available on the premise for inspection by Fire Department representatives?: Any and all permits 17. Hot work program authorization is NOT issued by the FDNY, it must be signed and issued by the : Responsible person 18. Hot work shall be available for inspection by any representative for after the work is completed: 48 hours 19. For hot work operation with citywide permit, the owner of the premises of the hot work operation areas must be notified in writing by the citywide permit holder at least the hot work is to be started: 48 hours before 20. Before hot work is authorized and at least while the authorization is in effect, the hot work area shall be inspected by the responsible person: once per day 21. The pre-hot work check must be conducted by the before hot work is authorized and at least : responsible person, once per day 22. Hot work area must be kept feet away from any combustible materials and combustible waste: 35 feet 5 / 5 23. All other hot work operations shall be conducted at least feet away from any combustible materials and combustible waste: 25 feet 24. Sprinkler system protection while hot work is performed.: must not be shut off or impaired
Written for
- Institution
- FDNYC F60
- Course
- FDNYC F60
Document information
- Uploaded on
- September 20, 2023
- Number of pages
- 10
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- fdnyc f60
- fdnyc
- atest update 2023
- 2024
- verified and rated
-
fdnyc f60 fireguard exam test questions and answer
Also available in package deal