C857 Software Quality Assurance – Pre-assessment Questions and answers. Rated A+
C857 Software Quality Assurance – Pre-assessment Questions and answers. Rated A+ Inspection - -Management has requested that the development team have a moderator review their newest module of code. Which type of review is being asked for? Black box - -An informal review of a module of code has been completed. The development team has decided to evaluate the module from an end user perspective. Which method should be used to determine if the code meets quality standards? Black box testing - -There is a requirement to verify the usability of a product as it is being delivered to ensure overall design and functionality without regard to the internal functioning of the code. Which quality method meets this requirement? Code inspection - -QA proposes a formal group meeting where the programmer narrates, statement by statement, the logic of a program as an error detection technique. Which quality method meets this proposal? Backtracking - -A program's state changes from what is expected. Which practice should be applied to find the location of the defect? Reproducing the error - -A web developer or QA tester encounters an error. What is the best practice to initiate resolution of this error? Ask to document each issue with details in a bug report. - -Which action should a developer take after receiving an email from a QA tester stating that the application under test is not working? Ask the QA team to provide the steps that led to that error. - -Which step should be taken first by a developer about a bug that was identified or reported by the QA team? Talk directly with the QA engineer. - -Which action should a developer take after the review of a bug report? Ask the developer if the bug report was reviewed. - -Which action should the QA team lead take when the developer has failed to provide feedback after the bug report was delivered? Regression - -During the implementation phase of a project, the developer realizes the need to change part of the project that has already been written and tested. Which test type should be performed after these changes are made?
Written for
- Institution
-
Western Governors University
- Course
-
C857
Document information
- Uploaded on
- August 21, 2023
- Number of pages
- 4
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
c857 software quality assurance pre assessment q
Also available in package deal