6/21/23, 8:10 AM Banking Management System
BANKING MANAGEMENT SYSTEM
A PROJECT
SUBMITTED IN PARTIAL-FULFILMENT OF THE REQUIREMENT
FOR THE AWARD OF THE DEGREE OF
MASTER OF COMPUTER APPLICATION
BY
SARVESH KUMAR
(MCA/40067/20)
DEPARTMENT OF COMP.SC. & ENGG.
BIRLA INSTITUTE OF TECHNOLOGY
LALPUR, RANCHI-834001
about:blank 1/29
,6/21/23, 8:10 AM Banking Management System
(MO 2022)
DECLARATION CERTIFICATE
This is to certify that the work presented in the project entitled “ BANKING
MANAGEMENT SYSTEM “ in partial fulfilment of the requirement for the
awarded degree of Master of Computer Application ,of Birla Institute of
Technology , Lalpur , Ranchi , is an authentic work carried out under my
supervision . To the best of my knowledge , The content of this project does
not form a basis for the awarded of any previous Degree to any one else.
Date Guide name & Signature
Dept to Comp Sc. & Engg
BIT Extn Center , Lalpur
about:blank 2/29
, 6/21/23, 8:10 AM Banking Management System
CERTIFICATE OF APPROVAL
The foregoing project en琀椀tled, “Banking Managemnt System” is hereby
approved as a creditable study of research topic and has been presented in a
sa琀椀sfactory manner to warrant its acceptance as prerequisite to the degree
for which it was submi琀琀ed. It is understood that by this approval, the
undersigned do not necessarily endorse any conclusion drawn or opinion
expressed therein, but approve the thesis for the purpose for which it is
submi琀琀ed
(Internal Examiner) (External Examiner)
(Director /In-charge)
about:blank 3/29
BANKING MANAGEMENT SYSTEM
A PROJECT
SUBMITTED IN PARTIAL-FULFILMENT OF THE REQUIREMENT
FOR THE AWARD OF THE DEGREE OF
MASTER OF COMPUTER APPLICATION
BY
SARVESH KUMAR
(MCA/40067/20)
DEPARTMENT OF COMP.SC. & ENGG.
BIRLA INSTITUTE OF TECHNOLOGY
LALPUR, RANCHI-834001
about:blank 1/29
,6/21/23, 8:10 AM Banking Management System
(MO 2022)
DECLARATION CERTIFICATE
This is to certify that the work presented in the project entitled “ BANKING
MANAGEMENT SYSTEM “ in partial fulfilment of the requirement for the
awarded degree of Master of Computer Application ,of Birla Institute of
Technology , Lalpur , Ranchi , is an authentic work carried out under my
supervision . To the best of my knowledge , The content of this project does
not form a basis for the awarded of any previous Degree to any one else.
Date Guide name & Signature
Dept to Comp Sc. & Engg
BIT Extn Center , Lalpur
about:blank 2/29
, 6/21/23, 8:10 AM Banking Management System
CERTIFICATE OF APPROVAL
The foregoing project en琀椀tled, “Banking Managemnt System” is hereby
approved as a creditable study of research topic and has been presented in a
sa琀椀sfactory manner to warrant its acceptance as prerequisite to the degree
for which it was submi琀琀ed. It is understood that by this approval, the
undersigned do not necessarily endorse any conclusion drawn or opinion
expressed therein, but approve the thesis for the purpose for which it is
submi琀琀ed
(Internal Examiner) (External Examiner)
(Director /In-charge)
about:blank 3/29