100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CUSP - T&D Questions & Answers | 150 Questions with 100% Correct Answers | Verified | 24 Pages

Rating
-
Sold
3
Pages
24
Grade
A+
Uploaded on
25-05-2023
Written in
2022/2023

As per CAN/ULC S801, on an electrical distribution overhead utility line circuit, verification of voltage absence can be achieved by: - Using an approved voltage detector. Isolation and tagging (no locks) is acceptable on an overhead distribution circuit under some of the following conditions, EXCEPT for: - The isolation can be operated from the ground directly at the base of a structure. Isolation and tagging (no locks) is acceptable for an overhead distribution circuit under some of the following conditions: - 1. The isolation point is a physical and visual like a line cut or riser removed. 2. The isolation point can only be operated by the operating authority or qualified worker. 3. The isolation point is protected from unauthorized access such as vertical height spacing. Consider that a circuit has been isolated, tagged and grounded. workers returning the next day must: - Visually check grounds to verify they are in good order, secure and test for voltage. For lockout purposes, energy isolating devices shall be labelled or marked using a standardized nomenclature and format to indicate their function. Identification shall include: - The equipment type, energy type, and magnitude

Show more Read less
Institution
CUSP - T&D
Course
CUSP - T&D










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CUSP - T&D
Course
CUSP - T&D

Document information

Uploaded on
May 25, 2023
Number of pages
24
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CUSP - T&D Questions & Answers As per CAN/ULC S801, on an electrical distribution overhead utility line circuit, verification of voltage absence can be achieved by: - ✔✔Using an approved voltage detector. Isolation and tagging (no locks) is acceptable on an overhead distribu tion circuit under some of the following conditions, EXCEPT for: - ✔✔The isolation can be operated from the ground directly at the base of a structure. Isolation and tagging (no locks) is acceptable for an overhead distribution circuit under some of the following conditions: - ✔✔1. The isolation point is a physical and visual like a line cut or riser removed. 2. The isolation point can only be operated by the operating authority or qualified worker. 3. The isolation point is protected from unauthorized access such as vertical height spacing. Consider that a circuit has been isolated, tagged and grounded. workers returning the next day must: - ✔✔Visually check grounds to verify they are in good order, secure and test for voltage. For lockout purposes, energy isolating devices shall be labelled or marked using a standardized nomenclature and format to indicate their function. Identification shall include: - ✔✔The equipment type, energy type, and magnit ude. Utilities often use a permitting system due to special circumstances of which conventional lockout is impracticable. The following is NOT a justified approach to this process: - ✔✔The isolation points are only simple single step actions. A high volt age utility or electrical company is authorized to use Complex Lockout (tag permitting) under what regulatory condition: - ✔✔A variance application has been approved by the provincial authority. Utilities often use a permitting system due to special circu mstances of which conventional lockout is impracticable. The following are justified approaches to this process: - ✔✔1. The isolation points are located in remote areas with difficult or restricted access. 2. The length of time to perform the lockout is im practicable. 3. Excessive numbers of persons required to lockout. Work on a distribution line must consider the following items when performing isolation and de -
energizing of the circuit.: - ✔✔1. Whether there are multiple sources of energy (loop feed) o n the circuit. 2. Is the line isolating device capable of interrupting load. 3. Is the line to be subject to inductive or capacitive charge. According to the CAN/ULC S801, what is the LEAST DESIRABLE type of fall protection: - ✔✔Fall Arrest System (FAS) Within Z259.14 standards fall restriction equipment (FRE) may only be leather in subcomponents or elements that are NOT exposed to: - ✔✔A dynamic load. As per Z259 standards, energy absorbing lanyards shall be classified according to their ability to absorb the kinetic energy from a fall as follows: - ✔✔Class E4 (4.0 kN) and Class E6 (6.0 kN) energy absorbing lanyards. Assuming that the fall protection system is correctly being used, in what scenario might the worker still contact the ground if they fell: - ✔✔Working 16 feet up in a bucket truck on distribution secondary services using a six foot shock absorbing lanyard, connected to the approved bucket anchor. What is NOT defined as a requirement of temporary vertical life lines as per Z259 standards: - ✔✔100% polypropylene fibers provide the greatest breaking strength. Requirements of temporary vertical life lines, as per Z259 standards: - ✔✔1. Shall be made from synthetic fibers with breaking strength of 27 kN or greater. 2. They shall be free of splices and knots, except at the terminations. 3. They shall be installed to protect against abrasion and sharp edges. Working on an energized lattice tower requires emergency response consistent with the associated hazards. What is NOT required as part of the emergency planning: - ✔✔Daily practice of tower rescue method.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Tulloch Florida State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1699
Member since
2 year
Number of followers
1359
Documents
11750
Last sold
5 days ago

3.9

332 reviews

5
161
4
63
3
59
2
12
1
37

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions