100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

IRC EXAM QUESTIONS AND ANSWERS 2023

Rating
-
Sold
-
Pages
20
Grade
A+
Uploaded on
09-01-2023
Written in
2022/2023

the purpose of this code is to establish ____________ requirements to safeguard the public safety, health, and general welfare. - Answer- minimum where, in any specific case, different sections of this code specify different materials, methods of construction or other requirement, the most __________ shall govern - Answer- restrictive where a referenced code or standard includes subject matter that is within the scope of the IRC, the provision of the _________ shall take precedence - Answer- IRC an alternative material or method shall be approved where the proposed design is ________ and complies with the ________ of the code - Answer- satisfactory intent compliance with the specific _______ - based provisions of the International Codes in lieu of specific requirements of the IRC shall be permitted as an alternative - Answer- performance a permit is not required for one-story detached accessory structures used as tool or storage sheds, playhouses and similar uses, provided the floor area does not exceed ______ square feet - Answer- 200 sq. ft. fences that are _______ feet or less in height do not require permits - Answer- 7 a permit is not required for the replacement or branch circuit overcorrect devices (breakers) of the required capacity in the same location (within a panel) - Answer- True unattached decks not exceeding _____ square feet in area, that are not more than _______ inches above grade do not require a permit - Answer- 200 30 where equipment replacement and repairs must be performed in an emergency situation, the permit application shall be submitted within the ______ _______ business days - Answer- next working an application for a permit for any proposed work shall be deemed to have been abandoned _____ days after the date of filing - Answer- 180 days before issuing a permit, the building official is _______ to examine or cause to be examined buildings, structures and sites for which an application has been filed - Answer- authorized

Show more Read less
Institution
IRC
Course
IRC










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
IRC
Course
IRC

Document information

Uploaded on
January 9, 2023
Number of pages
20
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Greaterheights Birkbeck, University of London
View profile
Follow You need to be logged in order to follow users or courses
Sold
1119
Member since
3 year
Number of followers
880
Documents
18200
Last sold
7 hours ago

4.0

209 reviews

5
113
4
41
3
24
2
10
1
21

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions