Professional practice architecture Questions And Answers!!
which of the following is not a common trait of a professional expertise and judgement performs manual labor relative autonomy all of the above performs manual labor what is the basic reason that architects are required to be licensed and registered by the state to practice their profession to maintain the health and safety of the community qualifications for licensure as a professional is based on a combination of what three components education experience exam eligibility to take the architectural licensing exam is based on units of credits the combination of units must total at least 12 eligibility to take the certified interior designer licensing examination is based on units of credits. how many units must they total 7 an architect in violation of the aia code of ethics can have his license revoked or suspended by the AIA false what is the ncarb and what do they do the national council of architecture registration boards. they are in charge of writing the ARE what is plan stamping or rubber stamping putting a licensed stamp of approval that you did not do or fully review what is the IDP and what organization administers the program architecture experience program. the NCARB administers the program T or F all jurisdictions have the exact same architectural licensing requirements f what is the awcpa of 1990 and what is its purpose it is the copy right act that states that an architects drawings can be copyrwrited if unique and that the client does not own the right to them unless the architect sells them the copy right what is the standard of reasonable care and what is its roe for professionals an architect of good standing would have made a similar decision at the same time and locale. usually used in lawsuits against architects as a key witness as a normal judge does not have enough experience in the field what type of insurance covers architects for negligent acts, erros, or omissions resulting from the performance of professional services professional insurance what does rfp stand for request for proposal what is the purpose of an rfp. specify the roles of the two principle parties sets the scope for the project the firms make a proposal, get interviewed from short list, then sign contract of awarded job owner makes scope, makes shortlist, does interview, and selects the firm programming is part of the basic services an architect provides false list the five project phases typically included as part of basic services schematic design phase design development phase construction documents phase bidding or negotiation phase construction phase list three typical architect selection approaches a prospective client might use price experience availability what is the purpose of MWBE requirements the minority and women owned building enterprise stands to incentivize women and minoritys in the field what is boilerplate legal words that can be used over and over what is a short list in the marketing process a small selection from all proposals that usually will be interviewed further three typical overhead expenses rent utilities insurance what is the typical project delivery method design bid build first step in DBB b101 is signed second step in DBB preliminary design third step in dbb construction docs fouth step in dbb owner hires general contractor first step for rfp issue rfp second step for rfp submit proposals third step for frp short list determined by the owner fourth step for rfp interviews fifth step to rfp successful firm determined five project phases in order for basic services schematic design design development construction doc bidding negotiation construction three compensation options an architect might consider for payment fixed fee hourly and fee multiplier cost plus fixed fee what type of project by law is typically organized with separate prime contractos public what is a contingency and how much is withheld a sum of the whole project that is set aside for unforeseen issues. usually a sum between 10-20 percent depending on the scope and owners requirements bidding forms bidding requirements exterior elevation drawings general conditions contract conditions division 3 specifications owner contract agreement contract forms change orders contract modifications what is an allowance and when is the cost determined determined at the beginning of th process that is set aside for items other than just construction in CC what is an addenda includes what still has to be done and be after drwaings are complete what specification division typically has sections related to finishes 9 which part of a specifications section includes the submittal informations general name three parts of a masterspec specification section general products execution as defined in the aia general conditions of the contract drawings and specifications are meant to complement each other how many csi masterformat divisions are there 50 the submittals a designer can require mock up of a wall finish pattern stain colors on actual wood being used paint smaples w suggested finish who creates the required submittals contractor what is the bid opening opening of the bids from the contractors it happened after dd but before construction
Written for
- Institution
- Architecture
- Course
- Architecture
Document information
- Uploaded on
- November 23, 2022
- Number of pages
- 5
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
professional practice architecture questions and answers
-
which of the following is not a common trait of a professional expertise and judgement performs manual labor relative autonomy all of the abo