• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 534 pages
Exam (elaborations)

CMAA Certified Associate Construction Manager (CACM®) Examination Exam

Document preview thumbnail
Preview 4 out of 534 pages

Strengthen your preparation for CMAA Certified Associate Construction Manager (CACM®) Examination Exam with an independently prepared study resource that keeps review centered on the exact credential you are targeting. Its skilled-trades focus supports review of technical terminology, practical decision-making, code-aware thinking, and professional responsibilities associated with the named examination area. Use it to make study sessions more intentional: review, pause, self-check, return to weak areas, and repeat until the material feels more secure. Clear exam naming also helps you confirm that the listing matches the credential you intend to study before adding the document to your Stuvia library. It is intended only as an independent revision aid and does not imply any affiliation, endorsement, or partnership with the organization associated with the examination.

Content preview

CMAA Certified Associate
Construction Manager
(CACM®) Examination
Exam

,18569 QUESTIONS



Question 1
For Managing high-risk construction activities, which combined brief retains the
intended scope?
A. Fall protection; excavation and trenching; tracking Total Recordable Incident Rates (TRIR)
B. Fall protection; excavation and trenching; Experience Modification Rates (EMR)
C. Fall protection; excavation and trenching; crane and rigging safety
D. Fall protection; excavation and trenching; job safety analyses (JSAs)
Correct Answer: C

Full Explanation:
The coherent group is Fall protection; excavation and trenching; crane and rigging safety. These
concerns belong together within Managing high-risk construction activities. Each other group replaces
one relevant concern with an item from a different focus.



Question 2
A coordinated review separates Program and Project Management, Cost control
systems, and Technology in Construction Management. Which allocation
preserves all three distinctions?
A. 1. Establishing, monitoring, and updating the project budget throughout the life cycle; 2.
Project governance, steering committees, milestone reviews, and phase-gate decision-making
frameworks; 3. Project management software applications for scheduling, cost control,
document management, and field reporting
B. 1. Project governance, steering committees, milestone reviews, and phase-gate
decision-making frameworks; 2. Establishing, monitoring, and updating the project budget
throughout the life cycle; 3. Project management software applications for scheduling, cost
control, document management, and field reporting
C. 1. Project governance, steering committees, milestone reviews, and phase-gate
decision-making frameworks; 2. Project management software applications for scheduling,
cost control, document management, and field reporting; 3. Establishing, monitoring, and
updating the project budget throughout the life cycle
D. 1. Project management software applications for scheduling, cost control, document
management, and field reporting; 2. Establishing, monitoring, and updating the project
budget throughout the life cycle; 3. Project governance, steering committees, milestone
reviews, and phase-gate decision-making frameworks
Correct Answer: B

Full Explanation:
Program and Project Management addresses project governance, steering committees, milestone
reviews, and phase-gate decision-making frameworks; Cost control systems addresses establishing,
monitoring, and updating the project budget throughout the life cycle; Technology in Construction
Management addresses project management software applications for scheduling, cost control,
document management, and field reporting. The correct allocation keeps each concern with its own
focus instead of interchanging the descriptions.




2

,18569 QUESTIONS



Question 3
An evidence package addresses Design-Build (DB); Construction Management at
Risk (CMAR/CMc); Construction Management Multi-Prime for Overview of major
project delivery systems. Which related concern should complete it?
A. litigation management protocols
B. change orders
C. Design-Bid-Build (DBB)
D. mediation
Correct Answer: C

Full Explanation:
Overview of major project delivery systems brings together Design-Bid-Build (DBB); Design-Build
(DB); Construction Management at Risk (CMAR/CMc); Construction Management Multi-Prime.
Design-Bid-Build (DBB) belongs with the concerns already given; the alternatives shift attention to
different subjects.



Question 4
A supervisor assigns a task involving Program and Project Management. Which
brief matches that assignment?
A. Defining project scopes, objectives, and deliverables in alignment with owner requirements
and constraints
B. Prequalification of contractors/subcontractors, developing request for proposals (RFPs),
bidding procedures, and evaluation criteria
C. Fall protection, excavation and trenching, confined space entry, crane and rigging safety, and
electrical safety
D. Data security, cybersecurity best practices, cloud-based collaboration platforms, and
electronic document sign-off protocols
Correct Answer: A

Full Explanation:
Program and Project Management specifically addresses defining project scopes, objectives, and
deliverables in alignment with owner requirements and constraints. The other choices concern
different technical focuses and do not identify this particular relationship.




3

, 18569 QUESTIONS



Question 5
A work package is dedicated to Earned Value Management (EVM). Which
combination fits it?
A. Tracking Planned Value (PV); Actual Cost (AC); Cost Variance (CV)
B. Tracking Planned Value (PV); Actual Cost (AC); progress payment reviews
C. Tracking Planned Value (PV); Actual Cost (AC); Optimizing life-cycle costs without
compromising quality
D. Tracking Planned Value (PV); Actual Cost (AC); functional requirements
Correct Answer: A

Full Explanation:
The coherent group is Tracking Planned Value (PV); Actual Cost (AC); Cost Variance (CV). These
concerns belong together within Earned Value Management (EVM). Each other group replaces one
relevant concern with an item from a different focus.



Question 6
Which item should be distinguished from the direct concerns of Professional
Practice and Ethics?
A. maintaining professional competence through continuing education
B. licensing requirements
C. field reporting
D. Professional liability
Correct Answer: C

Full Explanation:
field reporting is associated with Technology in Construction Management. In contrast, Professional
liability; licensing requirements; maintaining professional competence through continuing education
belong within the specific focus of Professional Practice and Ethics.




4

Document information

Uploaded on
November 4, 2026
Number of pages
534
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$85.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
nikhiljain22
3.5
(276)
Sold
1175
Followers
45
Items
54153
Last sold
18 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions