Construction Manager
(CACM®) Examination
Exam
,18569 QUESTIONS
Question 1
For Managing high-risk construction activities, which combined brief retains the
intended scope?
A. Fall protection; excavation and trenching; tracking Total Recordable Incident Rates (TRIR)
B. Fall protection; excavation and trenching; Experience Modification Rates (EMR)
C. Fall protection; excavation and trenching; crane and rigging safety
D. Fall protection; excavation and trenching; job safety analyses (JSAs)
Correct Answer: C
Full Explanation:
The coherent group is Fall protection; excavation and trenching; crane and rigging safety. These
concerns belong together within Managing high-risk construction activities. Each other group replaces
one relevant concern with an item from a different focus.
Question 2
A coordinated review separates Program and Project Management, Cost control
systems, and Technology in Construction Management. Which allocation
preserves all three distinctions?
A. 1. Establishing, monitoring, and updating the project budget throughout the life cycle; 2.
Project governance, steering committees, milestone reviews, and phase-gate decision-making
frameworks; 3. Project management software applications for scheduling, cost control,
document management, and field reporting
B. 1. Project governance, steering committees, milestone reviews, and phase-gate
decision-making frameworks; 2. Establishing, monitoring, and updating the project budget
throughout the life cycle; 3. Project management software applications for scheduling, cost
control, document management, and field reporting
C. 1. Project governance, steering committees, milestone reviews, and phase-gate
decision-making frameworks; 2. Project management software applications for scheduling,
cost control, document management, and field reporting; 3. Establishing, monitoring, and
updating the project budget throughout the life cycle
D. 1. Project management software applications for scheduling, cost control, document
management, and field reporting; 2. Establishing, monitoring, and updating the project
budget throughout the life cycle; 3. Project governance, steering committees, milestone
reviews, and phase-gate decision-making frameworks
Correct Answer: B
Full Explanation:
Program and Project Management addresses project governance, steering committees, milestone
reviews, and phase-gate decision-making frameworks; Cost control systems addresses establishing,
monitoring, and updating the project budget throughout the life cycle; Technology in Construction
Management addresses project management software applications for scheduling, cost control,
document management, and field reporting. The correct allocation keeps each concern with its own
focus instead of interchanging the descriptions.
2
,18569 QUESTIONS
Question 3
An evidence package addresses Design-Build (DB); Construction Management at
Risk (CMAR/CMc); Construction Management Multi-Prime for Overview of major
project delivery systems. Which related concern should complete it?
A. litigation management protocols
B. change orders
C. Design-Bid-Build (DBB)
D. mediation
Correct Answer: C
Full Explanation:
Overview of major project delivery systems brings together Design-Bid-Build (DBB); Design-Build
(DB); Construction Management at Risk (CMAR/CMc); Construction Management Multi-Prime.
Design-Bid-Build (DBB) belongs with the concerns already given; the alternatives shift attention to
different subjects.
Question 4
A supervisor assigns a task involving Program and Project Management. Which
brief matches that assignment?
A. Defining project scopes, objectives, and deliverables in alignment with owner requirements
and constraints
B. Prequalification of contractors/subcontractors, developing request for proposals (RFPs),
bidding procedures, and evaluation criteria
C. Fall protection, excavation and trenching, confined space entry, crane and rigging safety, and
electrical safety
D. Data security, cybersecurity best practices, cloud-based collaboration platforms, and
electronic document sign-off protocols
Correct Answer: A
Full Explanation:
Program and Project Management specifically addresses defining project scopes, objectives, and
deliverables in alignment with owner requirements and constraints. The other choices concern
different technical focuses and do not identify this particular relationship.
3
, 18569 QUESTIONS
Question 5
A work package is dedicated to Earned Value Management (EVM). Which
combination fits it?
A. Tracking Planned Value (PV); Actual Cost (AC); Cost Variance (CV)
B. Tracking Planned Value (PV); Actual Cost (AC); progress payment reviews
C. Tracking Planned Value (PV); Actual Cost (AC); Optimizing life-cycle costs without
compromising quality
D. Tracking Planned Value (PV); Actual Cost (AC); functional requirements
Correct Answer: A
Full Explanation:
The coherent group is Tracking Planned Value (PV); Actual Cost (AC); Cost Variance (CV). These
concerns belong together within Earned Value Management (EVM). Each other group replaces one
relevant concern with an item from a different focus.
Question 6
Which item should be distinguished from the direct concerns of Professional
Practice and Ethics?
A. maintaining professional competence through continuing education
B. licensing requirements
C. field reporting
D. Professional liability
Correct Answer: C
Full Explanation:
field reporting is associated with Technology in Construction Management. In contrast, Professional
liability; licensing requirements; maintaining professional competence through continuing education
belong within the specific focus of Professional Practice and Ethics.