2017/745 Auditor (Medical
Device – Quality
Management System) Exam
,QUESTIONS
Question 1
A reviewer separates Management Responsibility, Resource Management, and Infrastructure from
Design and Development Controls (ISO 13485 Clause 7.3 / MDR Integration). Which description
maintains that distinction for Resource allocation, personnel competence, awareness, training
records, and infrastructure/work environment controls for cleanrooms and sterile processing?
A. Design and Development Controls (ISO 13485 Clause 7.3 / MDR Integration): Integration of
statutory and regulatory requirements into QMS documentation and procedures
B. Management Responsibility, Resource Management, and Infrastructure: Resource allocation,
personnel competence, awareness, training records, and infrastructure/work environment controls
for cleanrooms and sterile processing
C. Management Responsibility, Resource Management, and Infrastructure: Planning design and
development, inputs, outputs, verification, validation, design transfer, and design changes
D. Design and Development Controls (ISO 13485 Clause 7.3 / MDR Integration): Resource allocation,
personnel competence, awareness, training records, and infrastructure/work environment controls
for cleanrooms and sterile processing
Correct Answer: B
Full Explanation:
Management Responsibility, Resource Management, and Infrastructure addresses Resource
allocation, personnel competence, awareness, training records, and infrastructure/work environment
controls for cleanrooms and sterile processing. The separate focus of Design and Development
Controls (ISO 13485 Clause 7.3 / MDR Integration) is Planning design and development, inputs,
outputs, verification, validation, design transfer, and design changes. An assignment must reflect the
intended task, rather than transfer a different activity into its place.
2
,QUESTIONS
Question 2
When Conformity assessment routes based on classification, including quality management
system assessments and technical documentation checks is the task, which allocation avoids
substituting Notified Bodies, Competent Authorities, and EUDAMED for Classification Rules and
Conformity Assessment Pathways?
A. Notified Bodies, Competent Authorities, and EUDAMED: Role, designation, and oversight of
Notified Bodies under MDR implementation rules
B. Notified Bodies, Competent Authorities, and EUDAMED: Conformity assessment routes based on
classification, including quality management system assessments and technical documentation
checks
C. Classification Rules and Conformity Assessment Pathways: The European Databank on Medical
Devices (EUDAMED): Architecture, registration modules, UDI (Unique Device Identification), and
transparency mandates
D. Classification Rules and Conformity Assessment Pathways: Conformity assessment routes based
on classification, including quality management system assessments and technical documentation
checks
Correct Answer: D
Full Explanation:
Classification Rules and Conformity Assessment Pathways addresses Conformity assessment routes
based on classification, including quality management system assessments and technical
documentation checks. The separate focus of Notified Bodies, Competent Authorities, and EUDAMED
is The European Databank on Medical Devices (EUDAMED): Architecture, registration modules, UDI
(Unique Device Identification), and transparency mandates. An assignment must reflect the intended
task, rather than transfer a different activity into its place.
Question 3
What is the primary purpose of root-cause analysis?
A. Evaluate the management system through an internal audit process.
B. Maintain connections between an item’s identity and its relevant history.
C. Build recognition of relevant responsibilities and expected behavior.
D. Determine the underlying causes of an observed problem.
Correct Answer: D
Full Explanation:
Determine the underlying causes of an observed problem. Its purpose should be distinguished from
the purposes of the other activities listed
3
, QUESTIONS
Question 4
Which arrangement would keep Production and Service Provision, Sterilization, and Validation
distinct from Post-Market Surveillance System and Technical Documentation when addressing
Control of production and service provision, cleanliness of products, and contamination control?
A. Production and Service Provision, Sterilization, and Validation: Control of production and service
provision, cleanliness of products, and contamination control
B. Post-Market Surveillance System and Technical Documentation: Purchasing information
verification, incoming inspection, and maintaining supplier quality agreements under MDR economic
operator rules
C. Production and Service Provision, Sterilization, and Validation: Periodic safety review updates for
Class IIa, IIb, and III devices
D. Post-Market Surveillance System and Technical Documentation: Control of production and service
provision, cleanliness of products, and contamination control
Correct Answer: A
Full Explanation:
Production and Service Provision, Sterilization, and Validation addresses Control of production and
service provision, cleanliness of products, and contamination control. The separate focus of
Post-Market Surveillance System and Technical Documentation is Periodic safety review updates for
Class IIa, IIb, and III devices. An assignment must reflect the intended task, rather than transfer a
different activity into its place.
Question 5
When Control of production and service provision, cleanliness of products, and contamination
control is the task, which allocation avoids substituting Auditing Principles Specific to Medical
Devices for Production and Service Provision, Sterilization, and Validation?
A. Production and Service Provision, Sterilization, and Validation: Conducting Stage 1 and Stage 2
Audits for MD-QMS / MDR
B. Auditing Principles Specific to Medical Devices: Purchasing information verification, incoming
inspection, and maintaining supplier quality agreements under MDR economic operator rules
C. Auditing Principles Specific to Medical Devices: Control of production and service provision,
cleanliness of products, and contamination control
D. Production and Service Provision, Sterilization, and Validation: Control of production and service
provision, cleanliness of products, and contamination control
Correct Answer: D
Full Explanation:
Production and Service Provision, Sterilization, and Validation addresses Control of production and
service provision, cleanliness of products, and contamination control. The separate focus of Auditing
Principles Specific to Medical Devices is Conducting Stage 1 and Stage 2 Audits for MD-QMS / MDR. An
assignment must reflect the intended task, rather than transfer a different activity into its place.
4