• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 93 pages
Exam (elaborations)

North Carolina Solar PV Installer Certification Exam 2026 – Practice Questions and Verified Answers with Rationales

Document preview thumbnail
Preview 4 out of 93 pages

North Carolina Solar PV Installer Certification Exam 2026 – Practice Questions and Verified Answers with Rationales

Content preview

North Carolina Solar PV Installer Certification Practice Examination
2026 | Instant Download | Original Practice Questions, Answers and
Detailed Rationales | Solar Panel Installation, NEC Requirements, PV
System Design, Inverters, Battery Storage, Electrical Safety and
North Carolina Regulations




Section 1: Safety Practices, OSHA, and Jobsite Fundamentals (Questions 1–30)

Question 1

A crew is preparing to install a rooftop PV array on a two-story residential building in Raleigh.
The roof pitch is 6:12, and the eave height is 22 feet. Which OSHA subpart primarily governs
the fall protection obligations for this construction activity?

A. 29 CFR 1910 Subpart D

B. 29 CFR 1926 Subpart M

C. 29 CFR 1926 Subpart X

D. 29 CFR 1910 Subpart I



Correct Answer: B



Explanation: OSHA’s construction industry fall protection standard is 29 CFR 1926 Subpart M;
1910 governs general industry and does not apply to this construction work.



Question 2

,An installer is using a personal fall arrest system (PFAS) on a steep-slope roof. The anchorage
point is rated at 3,000 pounds but is located 8 feet above the work surface and 6 feet to the
side of the worker. Which principle is most critical when evaluating this anchorage?

A. The anchorage must support at least 5,000 pounds per worker or be designed by a
qualified person with a safety factor of two.

B. The anchorage only needs to support the worker’s body weight plus tools.

C. Anchorage height is irrelevant as long as the lanyard is shock-absorbing.

D. A 3,000-pound anchorage is always acceptable for PFAS in construction.



Correct Answer: A



Explanation: OSHA requires PFAS anchorage to support 5,000 lb per employee or be
designed by a qualified person with a safety factor of at least two; 3,000 lb is insufficient
absent such design.



Question 3

A solar installer is staging modules on a residential roof with a 4:12 pitch. The roof surface is
dry, but wind gusts are forecast at 25 mph. Which control measure best addresses the
struck-by hazard from an unsecured module?

A. Rely on the module’s weight to prevent movement.

B. Secure modules with temporary tie-downs or ballast and suspend work if wind exceeds
safe handling limits.

C. Place modules flat on the roof deck without fasteners until the end of the day.

D. Ask the homeowner to hold the modules while the crew works.



Correct Answer: B



Explanation: Temporary securing and wind-based work suspension directly control the
struck-by hazard; module weight alone is insufficient against uplift and sliding on a pitched
roof.

,Question 4

An installer is working alone on a ground-mounted array in a rural area of eastern North
Carolina. The inverter is energized, and the DC disconnect is open. Which lockout/tagout
(LOTO) practice is required before servicing the DC combiner?

A. Only the AC disconnect needs to be locked because the inverter isolates DC.

B. The DC disconnect must be locked and tagged, and stored energy must be verified absent
before work begins.

C. Verbal notification to the homeowner is sufficient for LOTO.

D. LOTO is optional for systems under 10 kW.



Correct Answer: B



Explanation: LOTO requires isolating all energy sources, locking/tagging the DC disconnect,
and verifying de-energization; the inverter does not eliminate DC-side stored energy
hazards.



Question 5

Which document establishes the minimum structural load requirements that a rooftop PV
mounting system must consider for a commercial building in North Carolina?

A. NEC Article 690

B. The North Carolina State Building Code, which adopts the International Building Code
(IBC) and ASCE 7

C. NFPA 70E only

D. The utility’s interconnection tariff



Correct Answer: B



Explanation: Structural loads—dead, live, wind, and seismic—are governed by the state
building code and ASCE 7; NEC 690 addresses electrical installation, not structural design.

, Question 6

A crew is installing racking on a standing-seam metal roof. Which fall hazard is most
commonly underestimated when working near skylights?

A. Skylights are always designed to support a person’s weight.

B. Skylights are structural openings that may not withstand a fall and must be guarded or
covered.

C. Skylights only pose a hazard on flat roofs.

D. Fall protection is not required if the skylight is closed.



Correct Answer: B



Explanation: Skylights are openings that often fail under fall loads; they must be protected
by guardrails, covers, or personal fall arrest systems regardless of being closed.



Question 7

During a site assessment, an installer notices a bee hive under the eave where conduit will
be run. What is the most appropriate first action?

A. Proceed with work and avoid disturbing the hive.

B. Stop work in that area, notify the homeowner, and arrange for professional pest removal
before continuing.

C. Spray the hive with water to relocate the bees.

D. Wear a bee suit and continue installation.



Correct Answer: B



Explanation: Stinging insects are a recognized jobsite hazard; work should stop and
professional removal arranged rather than risking crew safety or allergic reactions.



Question 8

Document information

Uploaded on
November 4, 2026
Number of pages
93
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$36.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TUTORWILLIAM
4.7
(91)
Sold
198
Followers
61
Items
6288
Last sold
5 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions